eGap
Skip Navigation LinksHome > Funding Applications > Funding Application Sections > ARP ESSER - Application Details
ARP ESSER - Application Details
Fayette County, American Rescue Plan (ARP) ESSER - Fiscal Year 2021 (Rev 0)
 
Go ToExpand Go To



Cover Page & Required Narratives

Superintendent of Schools 
Name*
ARP ESSER Point of Contact 
Name*
Role*
Phone*
Ext
Required Narratives 
How does the LEA plan to use funds to implement prevention and mitigation strategies in order to continuously and safely operate schools for in-person learning?
*
 ARP ESSER funds will be used to upgrade and replace HVAC units with new ION filtration, renovate restrooms, add new bottle filling stations to existing water fountains, replace carpet, and replace windows.  New textbooks will be ordered for students in grades K-12 in the areas of History and Science. Funding will be used to purchase new digital and print textbooks for students and correlating resources for the classroom teachers. These resources will give students and teachers direct access to the most up-to-date curriculum available in print and digital formats.  The resources will allow students digital access in response to the COVID-19 pandemic in a remote and/or blended environment.  The resources will also provide students with on-going opportunities to engage in fiction and non-fiction text which will address literacy skills regardless of the content area.  Professional development will be provided for the teachers to equip them to use these resources using sound instructional practices. 
How will the LEA ensure that the evidence-based interventions will address the academic impact of lost instructional time and ensure that those interventions respond to the academic, social, emotional, and mental health needs of all students including underrepresented student subgroups (each major racial and ethnic group, children from low-income families, children with disabilities, English Learners, gender, migrant students, students experiencing homelessness, and children and youth in foster care) and those who are particularly impacted disproportionately by the COVID-19 pandemic?
*
Through improvements to school buildings, our students will be provided an environment that is conducive to learning.   Our HVAC units, restrooms, and water fountains currently do not mitigate the spread of viruses.
How will the LEA comply with the requirements of section 427 of GEPA (20 U.S.C. 1228a)?
The description must include information on the steps the LEA proposes to take to permit students, teachers, and other program beneficiaries to overcome barriers (including barriers based on gender, race, color, national origin, disability, and age) that impede equal access to, or participation in, the ESSER III program.
*
All students, teachers, and beneficiaries will be provided equal access to the ESSER III program. The Fayette County Board of Education does not discriminate on the basis of race, color, religion, national origin, sex, disability, or age in its programs and activities and provides equal access to the Boy Scouts and other designated youth groups.
How will the LEA actively monitor their allocations, conduct interim audits to ensure an appropriate application of funds, collect and manage data elements required to be reported, and report this information to the community?
*
The ARP ESSER funds will be monitored through the finance department.  Interim audits will be conducted through the finance department.  The board of education will approve project bids and purchase orders for projects.  The local newspaper will provide board meeting information and the expense report will be posted on the district website.
How will the LEA meaningfully engage with families and communities throughout the life of the ARP ESSER and other relief funds?
*
 Each local school has a parent involvement committee that serves as a liaison between the school district and the parents.
Provide the URL for the LEA Return-to-Instruction Plan.
*https://www.fayette.k12.al.us/cms/lib/AL50000092/Centricity/ModuleInstance/31/Reopening%20plan%2021-22.pdf https://www.fayette.k12.al.us/

LEA Reservation to Address Loss of Instructional Time

LEAs must reserve at least 20 percent of funds to address loss of instructional time through the implementation of evidence-based interventions and ensure that those interventions respond to students' social, emotional, and academic needs and address the disproportionate impact of COVID-19 on underrepresented student subgroups.

For this reservation of funds, the following interventions are allowable:
1. Summer Learning & Summer Enrichment Programs
2. Extended Day Programs
3. Comprehensive After-School Programs
4. Extended School Year Programs
5. Other – See Intervention box E for more details.

Budget Amount & Details for Interventions Amount 
Intervention A (Summer Learning & Summer Enrichment Programs)
Intervention B (Extended Day Programs)
Intervention C (Comprehensive After-School Programs)
Intervention D (Extended School Year Programs)
Intervention E (Other)
Total Cost:


Intervention A (Summer Learning & Summer Enrichment Programs) 
Provide the following information for Intervention A (Summer Learning & Summer Enrichment Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to host a Summer Enrichment Camp during the Summer of 2023. The camp will run for two weeks for four days a week. Subjects to be covered are science, technology, engineering, mathematics and reading. We will purchase general supplies such as pencils, notebooks, glue, color pencils, copy paper, etc. to effectively run the program. We will also purchase ELA & Math manipulatives to help improve student achievement. Additionally, we will purchase an online subscription to XYZ Company for the duration of the summer program to assist our participating EL students with the curriculum (See attached job description). Total cost: $109,030.00
[Cont.]
9130 - [010-199] (Salaries) $54,450.00 | 9130 - [200-299] (Benefits) $11,430.00
9130 - [400-499] (Materials and Supplies) $2,800.00 | 9130 - [400-499] (Software) $20,000.00
4120 - [010-199] (Bus Driver Salaries) $12,500.00 | 4120 - [200-299] (Bus Driver Benefits) $3,200.00
4120 - [300-399] (Mileage for Buses) $4,650.00
N/A
Intervention B (Extended Day Programs) 
Provide the following information for Intervention B (Extended Day Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Intervention C (Comprehensive After-School Programs) 
Provide the following information for Intervention C (Comprehensive After-School Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Intervention D (Extended School Year Programs) 
Provide the following information for Intervention D (Extended School Year Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Intervention E (Other) 
Provide the following information for Intervention E (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
NOTE: If an LEA chooses to use the "Other" intervention option, the LEA must attach documentation in the Related Documents section that shows that the Intervention is evidence-based (Tier I | Tier II | Tier III | Tier IV).

Funding will be used to hire interventionists to help close the learning gaps for students who need additional academic support. All interventionist will primarily work with students   The interventionists will work with the classroom teachers and counselors to determine which students need support.  The primary areas of focus will be reading and math; however, the secondary interventionists may also help students in additional content areas if such support is necessary.  The support provided will target specific skills that are noted as being areas of deficit according to data.

ARP ESSER funds will be used to employ one system-wide Reading / EL specialist  (1.0 FTE) for the 2022-2023 and 2023-2024 school years to assist with the consistent increase of EL students within the district and provide assistance in Reading Instruction . In addition to working with students, the Reading / EL will work with classroom teachers to ensure appropriate instructional strategies are implemented.
Total cost: $167,384.00 | 2210 -084  (Salaries) $123,974.00 | 22100 - [210-250] (Benefits) $43,410.00

ARP ESSER funds will be used to employ one system-wide Math specialist  (1.0 FTE) for the 2022-2023 and 2023-2024 school years to assist with the consistent increase of math instruction. The math specialist will work with classroom teachers to ensure appropriate instructional strategies are implemented.  The math specialist will work with the classroom teachers and counselors to identified which students need support.  The math specialist will work in small groups to help students close learning gaps in math.
Total cost: $158,886.00 | 2210 -077  (Salaries) $116,824.00 | 22100 - [210-250] (Benefits) $42,062.00

ARP ESSER funds will be used to employ two intervention teachers for the middle school and high school.  (2.0 FTE) for the 2022-2023 and 2023-2024 school years to work with students and classroom teachers to ensure appropriate instructional strategies are implemented.
Total cost: $326,744.00 | 1100 -010  (Salaries) $240,706.00 | 1100 - [210-250] (Benefits) $86,038.00

ARP ESSER funds will be used to employ one retired intervention teacher for the middle school and high school.  (.57 FTE) for the 2022-2023 and 2023-2024 school years to work with students and classroom teachers to ensure appropriate instructional strategies are implemented.
Total cost: $68,928.00 | 1100 -018  (Salaries) $64,000.00 | 1100 - [210-250] (Benefits) $4,928.00

ARP ESSER funds will be used to employ three intervention teachers for the middle school and high school for one year.  (3.0 FTE) for the 2022-2023 school years to work with students and classroom teachers to ensure appropriate instructional strategies are implemented.
Total cost: $233,640.00 | 1100 -010  (Salaries) $170,995.00 | 1100 - [210-250] (Benefits) $62,645.00

Four teachers 180 days daily rate of pay FY23, FY24

One retired employee for FY23, FY24

 

Four Teachers for 2 years:

Teacher (1)  2210-084

2 year salary $123,974.00

2 year benefits $43,410.00 [2210-210-250]


Teacher (2)  2210-077

Two year salary $116,824.00

Two year benefits  $42,062.00  [2210-210-250]


Teacher (3) 1100-010

Two year salary $119,160.00

Two year benefits $42,462.00  [1100-210-250]


Teacher (4)  1100-010

Two year salary  $121,546.00

Two year benefits $43,576.00  [1100-210-250]

 
 

Retired Teacher 1100-018

Two year salary $64,000.00

Two year benefits $4,928.00  [1100-210-250]


TOTAL Salaries: $545,504.00

TOTAL Benefits $176,438.00


THREE teachers for one year


Teacher (1a)  1100-010

1 year salary $51,810.00

1 year benefits $19,793.00 [1100-210-250]


Teacher (2a) 1100-010

1 year salary $60,773.00

1 year benefits $21,494.00 [1100-210-250]


Teacher (3a) 1100-010 

1 year salary $58,412.00

1 year benefits $21,358.00 [1100-210-250]


GRAND Total of Salaries and Benefits:  $955,582.00

 

[1100-421] $179,425.00 Textbooks for English / Reading K-12 

 

 

 

 

 





4. Remaining ARP ESSER Fund Uses

The remaining LEA funds after the LEA Reservation to Address Loss of Instructional Time can be used for a wide range of activities to address needs arising from the COVID-19 pandemic. Please refer to the allowable uses document in the Document Library for more guidance.

Budget Amount & Details for Additional Uses (Include Name for Other Categories) Amount 
Category 1 (Personnel)
Category 2 (Technology & Online Subscriptions)
Category 3 (Facility Improvements)
Category 4 (Professional Development)
Category 5 (Curriculum Materials & Assessments)
Category 6 (Parent & Family Engagement Activities)
Category 7 (Other)
Category 8 (Other)
Category 9 (Other)
Category 10 (Other)
Category 11 (Other)
Category 12 (Other)
Administrative Costs (must be reasonable and necessary)
Indirect Costs (maximum amount is the unrestricted rate)
Total Cost:


Category 1 (Personnel) 
Provide the following information for Category 1 (Personnel):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example #1:
ARP ESSER funds will be used to employ two system-wide EL teachers (2.0 FTE) for the 2021-2022 and 2022-2023 school years to assist with the consistent increase of EL students within the district. In addition to working with students, the EL teachers will work with classroom teachers to ensure appropriate instructional strategies are implemented. (See job description in Related Documents section.)
Total cost: $550,880.00 | 1100 - [010-199] (Salaries) $354,450.00 | 1100 - [200-299] (Benefits) $196,430.00
Example #2:
ARP ESSER funds will be used to employ certified teachers and paraprofessionals for the 2021-2022 and 2022-2023 school years to assist with closing the achievement gap of students within the district. The following list identifies the number of teachers and paraprofessionals at each school: School A - 2 Paraprofessionals (2.0 FTE); School B - 1 Teacher (1.0 FTE) & 1 Paraprofessional (1.0 FTE). (See job description in Related Documents section.)
Total cost: $417,813.00 | 1100 - [010-199] (Salaries) $321,123.00 | 1100 - [200-299] (Benefits) $96,690.00
N/A
Category 2 (Technology & Online Subscriptions) 
Provide the following information for Category 2 (Technology & Online Subscriptions):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase Chromebooks, Chromebook carts, document cameras, and touch screen panels to increase academic technology usage and improve student achievement. ARP ESSER funds will also purchase a subscription to ABC (all subscriptions will expire prior to September 30, 2024).
Total Cost: $432,158.00 | 1100 - [300-399] (Software License) $30,000.00 | 1100 - [400-499] (Technology) $402,158.00
N/A
Category 3 (Facility Improvements) 
Provide the following information for Category 3 (Facility Improvements):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to replace 3 air conditioner units at ABC Elementary School, install 2 new air conditioner units at EFG Middle School, and repair 1 air conditioner unit at IJK High School. All services will be completed by June 2024. Total Cost: $55,500.00
7200 - [500-599] (Capitalized Units) $18,500.00 | 3200 - [400-499] (Non-Capitalized Units and Supplies for Repairs) $37,000.00

ARP ESSER funds will be used to upgrade and replace HVAC units with ION filtration, remove carpet and replace flooring at Berry High School, renovate existing restrooms and/or add additional restrooms,  add new bottle filling stations to existing water fountains, and replace windows county-wide. All six schools (Berry Elementary, Berry High, Fayette Elementary, Fayette Middle, Fayette County High, Hubbertville) will receive the benefit of the upgrades. Berry High School is the only remaining school in which the carpet needs to be removed and replaced with tile.  This will allow the classroom at Berry High School to become more sanitary and easier to clean.  These upgrades will mitigate viruses and prevent future outbreaks.  Through these preparations, schools should be able to respond to future COVID-19 outbreaks.   All upgrades will be completed before June 2024.  


Restrooms / Stadium / Schools  County-Wide $2,053,525.34 (7200-515)


Windows County-Wide $1,300,000.00 (7200-515)


HVAC Units County-Wide $500,000.00 (7200-515)


Bottle Filling Stations 75 stations at $1,280 per station / $920 per station (labor) $165,000.00 (7200-515)


Replace carpet in BHS ACCESS lab $8,000.00 (3200-704)



Total for Facility Improvements:  $4,026,525.34

Category 4 (Professional Development) 
Provide the following information for Category 4 (Professional Development):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to provide ongoing, high quality professional development for administrators, teachers, and other instructional staff that support increased student achievement in all core subject areas.
- Consultants: Our mathematics adoption textbook company (ABC Company) will provide high quality professional development in October 2021 and December 2021 to all teachers within the LEA to prepare them for the COS adoption. Total Cost: $14,000.00 | 2215 - [300-399] (Consultants) $14,000
- Stipends: Teachers and other instructional support staff will be provided a stipend to participate in professional development that is outside of their contracted hours during the Spring of 2022. Total Cost: $19,230.00 | 2215 - [010-199] (Stipends) $11,456.00 | 2215 - [200-299] (Benefits) $7,774.00
[Cont.]
- Substitutes: Teachers will work collaboratively during the school day to develop curriculum maps and common formative assessments once a quarter for the 2022-2023 school year for a total of 4 days. Our LEA uses ABC Company for subs, so all subs are contractual, and no benefits are provided. Total Cost: $18,000.00 | 2215 - [300-399] (Contract for Subs) $18,000
- Materials and Supplies: General supplies will be needed for all professional development sessions to include but not limited to chart paper, easels, paper, notebooks, pens, pencils, markers, colored pencils, etc. Total Cost: $3,400.00 | 2215 - [400-499] (Supplies & Materials) $3,400.00
[Cont.]
- Conference Attendance: 6 Teachers & 2 Administrators will attend the MEGA Conference (Mobile, AL) in July 2022 to be provided professional development from the ALSDE to support student achievement. Travel costs will include hotel, per diem, and mileage. Total Cost: $22,000.00 | 2215 - [600-899] (Registration) $4,000.00 | 2215 - [300-399] (Travel) $18,000.00
N/A
Category 5 (Curriculum Materials & Assessments) 
Provide the following information for Category 5 (Curriculum Materials & Assessments):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase assessment supplies and materials to help provide real time data to increase student achievement. These will include actual assessments and general supplies. All services will be purchased by the end of the 2021-2022 school year.
Total Cost: $8,791.00 | 2130 - [400-499] (Assessment Supplies & Materials) $8,791.00
ARP ESSER funds will be used to purchase English, History and Science textbooks to increase student achievement.  Additional interventional components for English/Reading K-12 textbooks will be purchased. These will include actual assessments and general supplies. All textbooks will be purchased by the end of the 2023-2024 school year.  Funding will be used to purchase new digital and print textbooks for students and correlating resources for the classroom teachers. These resources will give students and teachers direct access to the most up-to-date curriculum available in print and digital formats.  The resources will allow students digital access in response to the COVID-19 pandemic.  The resources will also provide students with on-going opportunities to engage in fiction and non-fiction text which will address literacy skills regardless of the content area.  Professional development will be provided for the teachers to equip them to use these resources using sound instructional practices.  Intervention material will be available to help students close the learning gap.
Total Cost: $400,000.00 | 1100-421 (Textbooks)
Category 6 (Parent & Family Engagement Activities) 
Provide the following information for Category 6 (Parent & Family Engagement Activities):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase family handouts and resources for our Family Literacy Night in 2021 and 2022. The resources will include ELA and Math manipulatives and supplies needed to create family activities.
Total Cost: $4,500.00 | 2190 - [400-499] (Supplies and Materials) $4,500.00
N/A
Category 7 (Other) 
Provide the following information for Category 7 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 8 (Other) 
Provide the following information for Category 8 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 9 (Other) 
Provide the following information for Category 9 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 10 (Other) 
Provide the following information for Category 10 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 11 (Other) 
Provide the following information for Category 11 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 12 (Other) 
Provide the following information for Category 12 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A


Administrative Costs 
Program Administration must be reasonable and necessary in order to manage the federal grant in a compliant and effective manner.*
Provide a summary of how the grant program will be administered, including the title of the staff responsible for the grant administration, the FTE(s), and other funding sources (if applicable) that will contribute to administrative staff salaries/benefits. Additionally, the description must include all estimated costs, match the administrative costs dollar amount listed above, and include the Function and Object codes associated with the charge.
N/A


Indirect Costs 
Indirect Costs represent the expenses of doing business that are not readily identified with the ARP ESSER but are necessary for the general operation of the organization and the conduct of activities it performs. These costs must be reasonable and necessary, and LEAs can use the unrestricted indirect cost rate for calculation.*
% - Unrestricted Indirect Cost Rate for LEA
Maximum Indirect Cost amount for the ARP ESSER Fund
Function/Object Code used on the Budget Grid

SYSTEM PLAN ITEMS RELATED BY FISCAL RESOURCE
Expand All Collapse All

There are currently no Goal or Action Step items associated with this Grant.