eGap
Skip Navigation LinksHome > Funding > Funding Application Sections > ARP ESSER - Application Details
ARP ESSER - Application Details
Montgomery County, American Rescue Plan (ARP) ESSER - Fiscal Year 2021 (Rev 0)
 
Go ToExpand Go To



Cover Page & Required Narratives

Superintendent of Schools 
Name*
ARP ESSER Point of Contact 
Name*
Role*
Phone*
Ext
Required Narratives 
How does the LEA plan to use funds to implement prevention and mitigation strategies in order to continuously and safely operate schools for in-person learning?
*
Montgomery Public Schools plans to utilize ARP ESSER III funds to Prepare, Prevent, and/ or Respond to the Covid 19 impact on our district. We plan to use the funds to provide conducive environments that considers the classroom space and safe students, upgrades to ventilation systems to classrooms and gathering areas, upgrades to doors, upgrade to camera systems to help with contact tracing, and the installation of vape detectors to prevent, close contacts, the sharing of paraphernalia, and the possibility of further lung damage in the instance a student contracts COVID 19. The district will also use the fund to repair our waste water facility to improve the overall cleanliness and health of our district. The funds are concentrated in areas of health, cleanliness, and distance which is recommended by the CDC.
How will the LEA ensure that the evidence-based interventions will address the academic impact of lost instructional time and ensure that those interventions respond to the academic, social, emotional, and mental health needs of all students including underrepresented student subgroups (each major racial and ethnic group, children from low-income families, children with disabilities, English Learners, gender, migrant students, students experiencing homelessness, and children and youth in foster care) and those who are particularly impacted disproportionately by the COVID-19 pandemic?
*

Montgomery Public Schools plans to utilize ARP ESSER III funds to Prepare, Prevent, and/ or Respond to the Covid 19 impact on our district. We plan to utilize funds in the following ways to address learning loss: 

1. The purchase of PowerSchool Hoonuit and Performance Matters along with other scientific researched based programs to track progress on the learning gaps in ELA (English, reading, and writing) and math. This will allow us to pinpoint which ELA and math skills were most affected by the lost time. 
2. Through additional funds we have trained the staff on the use of View-boards to enhance our approach to these identified areas 
3. Implement and support a summer learning academy K-12 to allow for extra time to make up for time missed due to COVID 19 which negatively impacted students. 
4. Add additional counseling services to help with student emotional trauma that has taken place during this time which has a direct impact on the learning of all students. 
5. Engage in a SEL curriculum that will be implemented in various ways to meet the needs of the students.

 
How will the LEA comply with the requirements of section 427 of GEPA (20 U.S.C. 1228a)?
The description must include information on the steps the LEA proposes to take to permit students, teachers, and other program beneficiaries to overcome barriers (including barriers based on gender, race, color, national origin, disability, and age) that impede equal access to, or participation in, the ESSER III program.
*
Montgomery Public Schools plans to utilize ARP ESSER III funds to Prepare, Prevent, and/ or Respond to the Covid 19 impact on our district. We plan to utilize funds to address learning loss in student subgroups: Additional counseling services as well as rich and diverse curriculum to help identify and address the needs of each specific subgroup. The counseling services will be able to individually and in a group setting address specific needs that pertain to students who are facing unique circumstances because of the diversity of students. IEP, EL, Low SES, and others will all have unique circumstances that will need to be addressed. The curriculum can be modified to allow for unique backgrounds that will be more suited to students of subgroups.
How will the LEA actively monitor their allocations, conduct interim audits to ensure an appropriate application of funds, collect and manage data elements required to be reported, and report this information to the community?
*
The LEA will provide monthly budgets by category to MPS management team and related stakeholders. MPS will also conduct periodic audits and work with management team to ensure funds are appropriated as outlined in the plan. Furthermore, MPS will post plan on district wide for community awareness and input. 
How will the LEA meaningfully engage with families and communities throughout the life of the ARP ESSER and other relief funds?
*
Montgomery Public Schools will purchase high quality instructional and intervention materials in the areas of English Language Arts curriculum (K-12) and Math curriculum (K-12). The district will purchase materials to support the Social and Emotional Learning curriculum. All of the curriculums that the district plans to purchase will be used to address any forms of learning loss or the aftereffects of it.  ARP ESSER III funds will be used to close the digital divide by purchasing new chrome books/iPads to sustain the district one-to-one initiative for all students in PK-12. This is being done to ensure that if a COVID-19 outbreak were to occur in 4 our district that we would have the ability to switch to a remote learning environment using the new chrome books/iPads.  Chrome books purchases from ESSER II and II will provide a necessary tool for both students and staff.  Schoology will drive instruction decisions and monitor progress.  Software licences and programming will be purchased to engage students in the learning of the Alabama Course of Study standards through both personalized and hybrid, when necessary, learning opportunities.
Provide the URL for the LEA Return-to-Instruction Plan.
*https://www.mps.k12.al.us/cms/lib/AL50000660/Centricity/Domain/183/MPS%20COVID_19_ResponsePlan_21.pdf

LEA Reservation to Address Loss of Instructional Time

LEAs must reserve at least 20 percent of funds to address loss of instructional time through the implementation of evidence-based interventions and ensure that those interventions respond to students' social, emotional, and academic needs and address the disproportionate impact of COVID-19 on underrepresented student subgroups.

For this reservation of funds, the following interventions are allowable:
1. Summer Learning & Summer Enrichment Programs
2. Extended Day Programs
3. Comprehensive After-School Programs
4. Extended School Year Programs
5. Other – See Intervention box E for more details.

Budget Amount & Details for Interventions Amount 
Intervention A (Summer Learning & Summer Enrichment Programs)
Intervention B (Extended Day Programs)
Intervention C (Comprehensive After-School Programs)
Intervention D (Extended School Year Programs)
Intervention E (Other)
Total Cost:


Intervention A (Summer Learning & Summer Enrichment Programs) 
Provide the following information for Intervention A (Summer Learning & Summer Enrichment Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to host a Summer Enrichment Camp during the Summer of 2023. The camp will run for two weeks for four days a week. Subjects to be covered are science, technology, engineering, mathematics and reading. We will purchase general supplies such as pencils, notebooks, glue, color pencils, copy paper, etc. to effectively run the program. We will also purchase ELA & Math manipulatives to help improve student achievement. Additionally, we will purchase an online subscription to XYZ Company for the duration of the summer program to assist our participating EL students with the curriculum (See attached job description). Total cost: $109,030.00
[Cont.]
9130 - [010-199] (Salaries) $54,450.00 | 9130 - [200-299] (Benefits) $11,430.00
9130 - [400-499] (Materials and Supplies) $2,800.00 | 9130 - [400-499] (Software) $20,000.00
4120 - [010-199] (Bus Driver Salaries) $12,500.00 | 4120 - [200-299] (Bus Driver Benefits) $3,200.00
4120 - [300-399] (Mileage for Buses) $4,650.00

ARP ESSER funds will be used to employ personnel for the Summer 2022, Summer 2023, and Summer 2024 school years to help mitigate learning loss by supporting the teaching of critical standards and providing targeted intervention based on individual student needs in all core subject areas. 

Summer Learning Employees: Total cost: $17,605,596.40 |9130 - [010-199] $13,904,880 (Salaries) / 9130 - [210-250] $2,705,321 (benefits) |9130 - [411] Extended Day Material and Supplies: $995,395.40. These are off-contract hours. MPS will hire off-contract security guards to assist in providing a safe and secure environment.

(Please see revised ARP ESSER Budget Details Breakdown document in the Related Documents for graph breakdown of salaries and benefits for personnel)

 
 
Intervention B (Extended Day Programs) 
Provide the following information for Intervention B (Extended Day Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
ARP ESSER funds will be used to employ personnel for the Extended Day Programs during the 2021-2022, 2022-2023, and 2023-2024 school years to help mitigate learning loss by reinforcing the teaching of critical standards and providing targeted tiered intervention based on individual student needs in all core subject areas.

Extended Day Learning Employees: Total cost: $3,774,246|9130 - [010-199] $3,035,250 (salaries) / 9130 - [210-250] $580,847 (benefits) |9130 - [411] Extended Day Material and Supplies: $158,149.  These are off-contract hours. MPS will hire off-contract security guards to assist in providing a safe and secure environment.

(Please see revised ARP ESSER Budget Details Breakdown document in the Related Documents for graph breakdown of salaries and benefits for personnel)

Intervention C (Comprehensive After-School Programs) 
Provide the following information for Intervention C (Comprehensive After-School Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)

ARP ESSER funds will be used to employ certified teachers for the 2021-2022, 2022-2023, and 2023-2024 school years to provide extended learning opportunities in comprehensive after-school programs designed to pre-view and review critical standards, and provide targeted intervention based on individual student need in all core subject areas. All services will end by September 2024. . Intervention C program operates for a total of five out of the six weeks and works in conjunction with Intervention B on the State Reserve which operates for a total of 1 of the six weeks.

Total cost: $731,297 | 9130 - [010-199] $528,750 (Salaries) | 9130 - [210-250] $100,204 (Benefits) |9130 - [411] (supplies and materials) $102,343. These are off-contract hours. 

(Please see revised ARP ESSER Budget Details Breakdown document in the Related Documents for graph breakdown of salaries and benefits for personnel)

 
Intervention D (Extended School Year Programs) 
Provide the following information for Intervention D (Extended School Year Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Intervention E (Other) 
Provide the following information for Intervention E (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
NOTE: If an LEA chooses to use the "Other" intervention option, the LEA must attach documentation in the Related Documents section that shows that the Intervention is evidence-based (Tier I | Tier II | Tier III | Tier IV).

ARP ESSER funds will be used to employ personnel for the Daily Bridge Support Program, Summer Bridge 2022, Summer Bridge 2023, and Summer 2024 school years to help transition students moving from one grade span to another.  In order to ensure students transition well, we will offer this opportunity for grades PreK-K, grades 5-6, and grades 8-9. 

Total cost: $4,011,700|Bridge Program Employees: 9130 - [010-199] $3,255,600 (salaries) / 9130 - [210-250] $636,732 (benefits)| |9130 - [411] Extended Day Material and Supplies: $119,368. These are off-contract hours. MPS will hire off-contract security guards to assist in providing a safe and secure environment.

(Please see revised ARP ESSER Budget Details Breakdown document in the Related Documents for graph breakdown of salaries and benefits for personnel)

 



4. Remaining ARP ESSER Fund Uses

The remaining LEA funds after the LEA Reservation to Address Loss of Instructional Time can be used for a wide range of activities to address needs arising from the COVID-19 pandemic. Please refer to the allowable uses document in the Document Library for more guidance.

Budget Amount & Details for Additional Uses (Include Name for Other Categories) Amount 
Category 1 (Personnel)
Category 2 (Technology & Online Subscriptions)
Category 3 (Facility Improvements)
Category 4 (Professional Development)
Category 5 (Curriculum Materials & Assessments)
Category 6 (Parent & Family Engagement Activities)
Category 7 (Other)
Category 8 (Other)
Category 9 (Other)
Category 10 (Other)
Category 11 (Other)
Category 12 (Other)
Administrative Costs (must be reasonable and necessary)
Indirect Costs (maximum amount is the unrestricted rate)
Total Cost:


Category 1 (Personnel) 
Provide the following information for Category 1 (Personnel):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example #1:
ARP ESSER funds will be used to employ two system-wide EL teachers (2.0 FTE) for the 2021-2022 and 2022-2023 school years to assist with the consistent increase of EL students within the district. In addition to working with students, the EL teachers will work with classroom teachers to ensure appropriate instructional strategies are implemented. (See job description in Related Documents section.)
Total cost: $550,880.00 | 1100 - [010-199] (Salaries) $354,450.00 | 1100 - [200-299] (Benefits) $196,430.00
Example #2:
ARP ESSER funds will be used to employ certified teachers and paraprofessionals for the 2021-2022 and 2022-2023 school years to assist with closing the achievement gap of students within the district. The following list identifies the number of teachers and paraprofessionals at each school: School A - 2 Paraprofessionals (2.0 FTE); School B - 1 Teacher (1.0 FTE) & 1 Paraprofessional (1.0 FTE). (See job description in Related Documents section.)
Total cost: $417,813.00 | 1100 - [010-199] (Salaries) $321,123.00 | 1100 - [200-299] (Benefits) $96,690.00
ARP ESSER funds will be used to employ 8 system-wide EL teachers (8.0 FTE) for the 2021-22 to the September 2024 school years to serve schools with growing populations of EL students within the district. MPS currently serves 2,500 students.  In addition to working with students, the EL teachers will work with classroom teachers to ensure appropriate instructional strategies are implemented. (See job description) EL Teachers Total cost: $2,262,951.60| 1100 - [010-199] (Salaries) $1,680,000.00   | 1100 - (210-250) (Benefits) $572,952  |1100 – [411] Materials and Supplies: $9,999.60 ARP ESSER funds will be used to contract and provide 2 Interpreter/translators (1 Spanish and 1 Korean) for the 2021-22 to the September 2024 school year to assist our growing populations of students whose primary language is not English within the district. These are our two prominent groups with growing needs for translation of printed material and to help with the language barrier during parent conferences, etc. (See job description) Interpreter/Translators Total cost: $230,000 (This is a contracted position $55 per hour) |1100 - [311] Contractual Services ARP ESSER funds will be used to employ five registered nurses (5.0 FTE) for the 2021-22 to September 2024 school years to aid with providing support to medically involved students and continue to ensure that all COVID-19 preventative measures are implemented fully in all sites. MPS currently has nursing staff that is shared among school sites across the district. (See Job description) Nurses Total cost: $ Total cost: $1,227,510 | 2140 - [010-199] (Salaries) $900,000.00     | 2140 – (210-250) (Benefits) $327,510   ARP ESSER funds will be used to support virtual school/program. During the pandemic, more families are requesting the ability to have students enrolled in a virtual option. MPS will expand the virtual school/program offerings available to families. MPS virtual school/program will expand to include grades 6-8. MPS will employ 8 content area teachers (8.0 FTE) for the 2021-2022 to September 2024 school years. Onsite teachers will be utilized to monitor student progress, facilitate supplemental instructional support, and proctor exams. In addition, 2 Guidance counselors will be assigned to each grade span (2.0 FTE) to provide academic and emotional counseling for students. Lastly, 2 special education teachers will be assigned to each grade span (2.0 FTE) to provide specialized support for applicable students. (See job description) 
Counselors Total cost: $671,589| 2120 - [010-199] (Salaries) $510,000.00 | 2120 - (210-250) (Benefits) $161,589   Content Area Teachers Total cost: $2,252,952| 1100 - [010-199] (Salaries) $1,680,000.00 | 1100 - (210-250) (Benefits) $572,952Special Educ Teachers Total cost: $563,238| 1100 - [010-199] (Salaries) $420,000.00 |1100 - (210-250) (Benefits) $143,238 ARP ESSER funds will be used to employ 4 computer technicians district-wide (4.0 FTE) for the 2021-2022 and 2022-2023 school years to assist with maintaining and repairing computer hardware and software throughout the district.  This will assist in the upkeep of the district’s technology, increasing academic technology usage and improving student achievement. (See job description) Total Cost: $654,836 | 2190 - [010-199] (Salaries) $448,240.00 | 2190 - (210-250) (Benefits) $206,596    
ARP ESSER funds will be used to employ 1 IT Help Desk employee (1.0 FTE) for the 2021-2022 through 2023-2024 school years to assist with managing work orders and technology inventory throughout the district.  This will assist in increasing academic technology usage and improving student achievement.  (See job description) 
Total Cost: $163,709 | 2190 - [010-199] (Salaries) $112,060| 2190 - (210-250) (Benefits) $51,649  ARP ESSER funds will be used to contract 1 IT programmer district-wide for the 2021-2022 school years to assist with creating programs to bring together the district’s software and internal documentation.  This will assist in creating a seamless flow of the district's software and internal documentation that will increase academic technology usage and improve student achievement. Total Cost: $194,400 ($31/hour-$45/hour) | 2190 - (339)  See remaining amount ($300,000) on page 9 ARP ESSER funds will be used to support the employment of 31 FTE Local Reading Specialists (LRS) and 1 FTE District Literacy Specialist for the 2021-2022, 2022-2023, and 2023-2024 school years.  LRSs work directly with classroom teachers to ensure appropriate instructional strategies are implemented in accordance with the Alabama Literacy Act.  Partial funding (58.2%=$52,881) for each LRS positions is provided by the ALSDE/ARI of the total cost of $90,847. (See job description) Total cost: $3,522,840 • This expenditure is the extra funding required for salaries and benefits after taking into consideration the funding anticipated from ALSDE in support of the 31 Local Reading Specialists. | 2210 - [010-199] (Salaries) $2,622,972 |2210 - (Benefits) $899,868  ARP ESSER funds will be used by schools to employ instructional/academic personnel (e.g., full/part-time retired teachers, tutors, college students, etc.) aligned to address ACIP needs for the 2001-2022, 2022-2023, and 2023-2024 school years.  This assistance can occur either during the school day or during extended learning time in order to assist with closing the achievement gap of students within the district.  Each school will be allocated $422.68 per student to expend annually during the 2021-2022, 2022-2023, and 2023-2024 school years. 
ARP ESSER funds will be used to provide every school with the PPA opportunity to employ retired teachers, tutors, or purchase materials and supplies aligned to ACIP needs in order to increase learning opportunities during the school day or during extended learning time.  Each school will be allocated $422.68 per child to expend annually during the 2021-2022, 2022-2023, and 2023-2024 school years.
Total Amount: $6,604,530.00  | (Salaries: $4,680,000 | 1100 - [010-199] | (Benefits: $360,828 1100 – [210-250] | (License fees:$559,172   1100 – [622] | (Materials & Supplies: $1,004,530  1100 – [411] ARP ESSER funds will be used to employ the following positions for the 2021-2022 school year to assist with closing the achievement gap of students while addressing learning loss in identified CSI schools that were additionally impacted by reduction in FY22 school improvement funding. Amounts:Dozier $16,665-(.20 FTE) Interventionist; Johnson Elem $26,838- (.33 FTE) interventionist; Brewbaker Intermediate $25,580- (.35 FTE) teacher; Davis $75,816- (1.0 FTE) Interventionist Total cost: $144,899 | (Salaries: $38,118 |1100 – [010-199]; Benefits $14,300 |1100 – [200-250] Salaries $67,248 |2190 – [010-199]; Benefits $25,233 |2190 – [200-250} (See ARP ESSER Budget Details Breakdown in related documents) -ARP ESSER funds will be used to employ 30 security guards (30.0 FTE) for the 2021-2022 to September 2024 school years to ensure campus safety and conducive teaching and learning environments for all elementary schools. Security Guards Total cost: $3,572,775 | 3100 - [010-199] (Salaries) $2,250,000.00 | 3100 - (210-250) (Benefits) $1,322,775  (Please refer to ARP ESSER Budget Details Breakdown in the related documents due to the limited characters allowed in typing)   
(See job description)
 

 

 
Category 2 (Technology & Online Subscriptions) 
Provide the following information for Category 2 (Technology & Online Subscriptions):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase Chromebooks, Chromebook carts, document cameras, and touch screen panels to increase academic technology usage and improve student achievement. ARP ESSER funds will also purchase a subscription to ABC (all subscriptions will expire prior to September 30, 2024).
Total Cost: $432,158.00 | 1100 - [300-399] (Software License) $30,000.00 | 1100 - [400-499] (Technology) $402,158.00
ARP ESSER funds will be used to purchase interactive panels for classrooms to provide a classroom environment that increases academic technology usage and improves student learning.  The budget below includes the interactive panels and installation. Total Budget for Materials and Installation: $766,770 |1100 - [494] Non-Capitalized Audio/Visual Equip    
ARP ESSER funds will be used to purchase docking stations for classroom computers to provide educators a seamless use of technology throughout the district and at home if students and staff are required to go virtual in the future.  By creating this seamless environment, there will be an increase in academic technology usage to improve student achievement.  The budget below includes the docking stations and installation. Total Budget for Materials and Installation: $1,216,770 |1100 - [495] Non-Capitalized Computers ARP ESSER funds will be used to purchase Apple IPads, Chromebooks, and laptops to increase academic technology usage and improve student achievement.  The budget below includes the devices and white glove services for each device. Total Budget: $7,633,461 1100 - [495] Non-Capitalized Computers ARP ESSER funds will be used to purchase the following online subscriptions for 2022-2023 & 2023-2024: Total Cost: $7,302,000   |1100 - [622] License Fees
Edgenuity Online Subscriptions: $2,500,000 – 2 years 
McGraw Online Subscriptions: $500,000 – 2 years  
Renaissance Online Subscriptions: $1,300,000 – 2 years  
Sonday System Online Subscriptions: $550,000 – 2 years  
USA Test Prep Online Subscriptions: $450,000 – 2 years  
Other Online Subscriptions $2,002,000 – 2 years
 

 

 
Category 3 (Facility Improvements) 
Provide the following information for Category 3 (Facility Improvements):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to replace 3 air conditioner units at ABC Elementary School, install 2 new air conditioner units at EFG Middle School, and repair 1 air conditioner unit at IJK High School. All services will be completed by June 2024. Total Cost: $55,500.00
7200 - [500-599] (Capitalized Units) $18,500.00 | 3200 - [400-499] (Non-Capitalized Units and Supplies for Repairs) $37,000.00
ARP ESSER funds will be used to purchase network survey services to analyze and optimize the district’s network to increase academic technology usage and improve student achievement.  The budget below includes the network survey services for the district. All services will be completed by September 2024. Total Budget: $300,000.00 | 2190 - (339)  ARP ESSER funds will be used to renovate and replace existing HVAC systems to provide better air quality to create a healthy environment more conducive to improving student learning.  The budget listed below includes the HVAC systems, and the materials and labor to install the HVAC systems.  See school listing below. All services will be completed by September 2024 Total Budget: $15,100,000.00 | |Materials and Labors: $15,100,000.00| 7200 – (515)Locations: Brew Tech HS, Brewbaker Intermediate, Brewbaker Primary, Crump Elementary, Goodwyn Middle School ARP ESSER funds will also be used to repair and maintain existing HVAC systems to provide better air quality to create a healthy environment more conducive to improving student learning.  See school listing below. The budget listed below includes labor to perform daily repairs and provide preventative maintenance to the existing HVAC systems up to September 2024 Total Budget: $4,800,000 |HVAC Services $4,500,000.00 |3400 – (339)|HVAC Supplies $300,000.00 |3400 – (449) Locations: Brew Tech HS (1), Brewbaker Intermediate(1), Brewbaker Primary(1), Crump Elementary(1), Goodwyn Middle School(50)ARP ESSER funds will be used to replace existing roofs to provide better air quality to create a healthy environment more conducive to improving student learning.  The budget listed below includes the roof systems, and the materials and labor to install the roofs.  All services will be completed by September 2024 Total Budget: $3,000,000.00  |Materials and Labors: $3,000,000 |7200 – (515) Locations: Jeff Davis HS, Dannelly Elementary, TS Morris Elementary, Southlawn Middle School, Wares Ferry Elementary ARP ESSER funds will be used to replace existing carpet with LVT to provide a flooring solution to create a healthy environment more conducive to improving student learning.  The budget listed below includes materials and labor for installing the flooring.  All services will be completed by September 2024. Total Budget for Materials and Labor: $1,000,000.00 |3200 – (704) Locations: Highland Gardens Elementary, Wares Ferry Elementary, Vaughn Road Elementary, Southlawn Elementary, Brewbaker Primary, Dannelly Elementary, Pintlala Elementary, E.D. Nixon, Catoma Elementary, Halcyon Elementary, Goodwyn Middle School, Carver Elementary.  ARP ESSER funds will be used to purchase Kaivac Restroom Disinfection Machines for school personnel to provide a safer and healthier school environment.  The budget below includes the equipment. All services will be completed by September 2024 Total Budget: $150,000.00 |3200 – (493) Location:Highland Gardens Elementary, Wares Ferry Elementary, Vaughn Road Elementary, Southlawn Elementary, Brewbaker Primary, Dannelly Elementary, Pintlala Elementary, E.D. Nixon, Catoma Elementary, Halcyon Elementary, Goodwyn Middle School, Carver Elementary, Brew Tech HS, Brewbaker Intermediate, Crump Elementary, Blount Elementary, MLK Elementary, Fitzpatrick Elementary, McKee Middle, MacMillan Elementary, Lee HS, Jeff Davis HS, Lanier HS, LAMP HS, MPACT, Park Crossing HS, Wilson Elementary, Davis Elementary, Capitol Hts Middle, Morningview Elementary, Highland Gardens Elementary, Highland Ave Elementary, BTW HS, Carr Middle, Johnson Elementary ARP ESSER funds will be used to purchase Tomcat floor and wall cleaners for school personnel to provide a safer and healthier school environment.  The budget below includes the equipment.  All services will be completed by September 2024 Total Budget: $250,000.00 |3200 – (493) Location: Highland Gardens Elementary, Wares Ferry Elementary, Vaughn Road Elementary, Southlawn Elementary, Brewbaker Primary, Dannelly Elementary, Pintlala Elementary, E.D. Nixon, Catoma Elementary, Halcyon Elementary, Goodwyn Middle School, Carver Elementary, Brew Tech HS, Brewbaker Intermediate, Crump Elementary, Blount Elementary, MLK Elementary, Fitzpatrick Elementary, McKee Middle, MacMillan Elementary, Lee HS, Jeff Davis HS, Lanier HS, LAMP HS, MPACT, Park Crossing HS, Wilson Elementary, Davis Elementary, Capitol Hts Middle, Morningview Elementary, Highland Gardens Elementary, Highland Ave Elementary, BTW HS, Carr Middle, Johnson Elementary, McIntyre, Baldwin Middle, Garrett Elementary, Vaughn Rd Elementary, Dunbar-Ramer ARP ESSER funds will be used to purchase Cintas wet and dry mop service for school personnel to provide a safer and healthier school environment.  The budget below includes the equipment and delivery services. All services will be completed by September 2024   Total Budget: $200,000.00 |3200 – (349) Location: District-wide ARP ESSER funds will be used to purchase desks and chairs for classrooms to provide a socially distanced environment that is safer and healthier for students.  The budget below includes furniture and set up. All services will be completed by September 2024  Total Budget: $5,000,000 |1100 – (492) Location: District-wide ARP ESSER funds will be used to purchase lunchroom tables to provide a socially distanced environment that is safer and healthier for students.  The budget below includes furniture and set up. All services will be completed by September 2024   Total Budget: $2,000,000.00 |2190 – (492) Location: District-wide ARP ESSER funds will be used to purchase temperature scanners to provide a socially distanced environment that is safer and healthier for students.  This will allow health monitoring of all individuals entering the building.  The budget below includes the temperature scanner equipment. All services will be completed by September 2024 Total Budget: $100,000.00 |2140 – (493) Location: Bellingrath Middle School, Carver High School, McKee Middle School, Park Crossing High School, Jeff Davis High School, Lee High School, Lanier High School ARP ESSER funds will be used to purchase school intercoms for providing information throughout the school day to increase the health and safety of the students and staff within the school.  The budget below includes intercom equipment and installation. All services will be completed by September 2024   Total Budget: $130,000.00 |3100 – (494) Location: McKee Middle, MacMillan Elementary, Blount, Highland Ave, Chisholm, Brewbaker Middle ARP ESSER funds will be used to purchase security cameras to increase the social-emotional well-being of the students and staff within the school.  In doing so, the environment will be healthier and safer in assisting contact-tracing and mitigating safety concerns.  The budget below includes the camera equipment and installation.  All services will be completed by September 2024. Total Budget: $750,000.00 |3100 – (494) Location: Carr Middle, Bear Elementary, Dalraida, McIntyre, Carver HS, Brew Tech, Brewbaker Middle, Brewbaker Intermediate, Brewbaker Primary ARP ESSER funds will be used to purchase PPE/Custodial supplies to increase the cleanliness and disinfecting of schools for the well-being of the students and staff.  In doing so, the environment will be healthier and safer in assisting contact-tracing and mitigating safety concerns up to September 2024.  Total Budget: $3,548,605.00 |3200 – (441)--

-ARP ESSER funds will be used to employ two logistics laborers for the 2021-2022 and 2022-2023, and 2023-2024 school years to assist with the dispersing of PPE supplies and the cleaning and disinfecting of buildings throughout the district.  This will assist in increasing custodial coverage throughout the district, and provide a safer and healthier environment for the students and staff in the school district.  (See job description) Total Cost: $491,004 (FTE 2 Logistics laborers)|3900 - [010-199] (Salaries) $360,000.00|3900 - (210-250) (Benefits) $131,004ARP ESSER funds will be used to provide salaries for custodial employees (FTE 88) tasked with providing safe and healthy environments pertinent in keeping students and staff in a face to face environment which is conducive to improving student learning.  The budget listed below includes salaries and benefits for custodial employees.Total Cost: $6,449,687 | Custodians Salaries:  3200 - [010-199] (Salaries) $4,009,707.00 | 3200 - (Benefits)$2,439,980.00 (See job descriptions)ARP ESSER funds will be used for salaries for HVAC employees (FTEs 4) to provide better air quality to create a healthy environment more conducive to improving student learning.  The budget listed below includes salaries and benefits for HVAC employees. (See job description) Total Cost: $690,472 |HVAC 3400 - [010-199] (Salaries) $435,908.00 |3400 - (Benefits) $254,564(Please see ARP ESSER Budget Details Breakdown for all Categories)

 

 

 
 
 
 
 
Category 4 (Professional Development) 
Provide the following information for Category 4 (Professional Development):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to provide ongoing, high quality professional development for administrators, teachers, and other instructional staff that support increased student achievement in all core subject areas.
- Consultants: Our mathematics adoption textbook company (ABC Company) will provide high quality professional development in October 2021 and December 2021 to all teachers within the LEA to prepare them for the COS adoption. Total Cost: $14,000.00 | 2215 - [300-399] (Consultants) $14,000
- Stipends: Teachers and other instructional support staff will be provided a stipend to participate in professional development that is outside of their contracted hours during the Spring of 2022. Total Cost: $19,230.00 | 2215 - [010-199] (Stipends) $11,456.00 | 2215 - [200-299] (Benefits) $7,774.00
[Cont.]
- Substitutes: Teachers will work collaboratively during the school day to develop curriculum maps and common formative assessments once a quarter for the 2022-2023 school year for a total of 4 days. Our LEA uses ABC Company for subs, so all subs are contractual, and no benefits are provided. Total Cost: $18,000.00 | 2215 - [300-399] (Contract for Subs) $18,000
- Materials and Supplies: General supplies will be needed for all professional development sessions to include but not limited to chart paper, easels, paper, notebooks, pens, pencils, markers, colored pencils, etc. Total Cost: $3,400.00 | 2215 - [400-499] (Supplies & Materials) $3,400.00
[Cont.]
- Conference Attendance: 6 Teachers & 2 Administrators will attend the MEGA Conference (Mobile, AL) in July 2022 to be provided professional development from the ALSDE to support student achievement. Travel costs will include hotel, per diem, and mileage. Total Cost: $22,000.00 | 2215 - [600-899] (Registration) $4,000.00 | 2215 - [300-399] (Travel) $18,000.00
ARP ESSER funds will be used to provide ongoing embedded professional development and coaching for the 2021-2022, 2022-2023, and 2023-2024 school years in math for K-5 teachers to strengthen pedagogical knowledge and ensure appropriate instructional practices necessary to fulfill the requirements of the new ALSDE math course of study.  ARP ESSER funds will be used to provide ongoing PD for 2022-2023 & 2023-2024 school years in support of the following online programs
Total Budget: $4,358,895.00 | 2215 – [312]Contractual Services/Consultants for Edgenuity & Renaissance (2 years) $3,019,500 | 2215 – [622] PD License Fees for Edgenuity & Renaissance (2 years) $1,339,395 

 

 


 
Category 5 (Curriculum Materials & Assessments) 
Provide the following information for Category 5 (Curriculum Materials & Assessments):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase assessment supplies and materials to help provide real time data to increase student achievement. These will include actual assessments and general supplies. All services will be purchased by the end of the 2021-2022 school year.
Total Cost: $8,791.00 | 2130 - [400-499] (Assessment Supplies & Materials) $8,791.00
ARP ESSER funds will be used to purchase 2022 English Textbook Adoption Support: Total Budget: $4,000,000 |1100 – (421)
Category 6 (Parent & Family Engagement Activities) 
Provide the following information for Category 6 (Parent & Family Engagement Activities):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase family handouts and resources for our Family Literacy Night in 2021 and 2022. The resources will include ELA and Math manipulatives and supplies needed to create family activities.
Total Cost: $4,500.00 | 2190 - [400-499] (Supplies and Materials) $4,500.00

Requested amount: Total Budget: $750,000 |2190 – (399) Explanation: With nearly 27,000 students and the necessary need to update several communication resources, MPS is requesting a total amount of $750, 000 to be used to used promote attendance awareness, parental involvement opportunities, and distance learning and conferencing and community outreach. In addition to these efforts, the district has a desperate need to update its digital streaming capabilities to be used for community outreach and strengthening parent and family engagement. As Montgomery Public Schools (MPS) continues to navigate through the COVID-19 pandemic, the need to use technology to communicate with our students, parents, employees, and community stakeholders is important. Our goal is to provide our students with digital streamed video tutorials and recorded standard-based lessons to support the unfinished learning gaps our students have experienced during the pandemic. In addition, we've planned to create supportive digital videos to help parents successfully navigate through virtual learning. In addition to our digital communication needs, MPS is working to create healthy communication pathways to strengthen our parent engagement programs at our schools and at the district level. 
Overview: Improve digital streaming capabilities to improve/close unfinished learning gaps for students, provide MPS staff clear and concise district directives and strengthen parental engagement to support student achievement
Provide digital content that supports standard-based  concepts 
Inform parents and community stakeholders of student achievement programs using digital capabilities
Examples:
High-resolution videos
Clear high resolution live video streams
Parental Engagement information pieces

 

 
Category 7 (Other) 
Provide the following information for Category 7 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
ARP ESSER funds will be used to pay for courses for teachers who qualify for provisional or conditional certificates for hard to staff subject areas.  This is needed so that qualified teacher candidates can be hired and obtain a valid certificate.  Qualified teachers are needed to help mitigate learning loss due to COVID-19.   COST: Approximately 50 teachers for 2 years each = Total Budget: $241,220|2215 – (412) The cost would cover books and tuition.  (See supporting documents)
Category 8 (Other) 
Provide the following information for Category 8 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Category 9 (Other) 
Provide the following information for Category 9 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Category 10 (Other) 
Provide the following information for Category 10 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Category 11 (Other) 
Provide the following information for Category 11 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Category 12 (Other) 
Provide the following information for Category 12 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)


Administrative Costs 
Program Administration must be reasonable and necessary in order to manage the federal grant in a compliant and effective manner.*
Provide a summary of how the grant program will be administered, including the title of the staff responsible for the grant administration, the FTE(s), and other funding sources (if applicable) that will contribute to administrative staff salaries/benefits. Additionally, the description must include all estimated costs, match the administrative costs dollar amount listed above, and include the Function and Object codes associated with the charge.
n/a


Indirect Costs 
Indirect Costs represent the expenses of doing business that are not readily identified with the ARP ESSER but are necessary for the general operation of the organization and the conduct of activities it performs. These costs must be reasonable and necessary, and LEAs can use the unrestricted indirect cost rate for calculation.*
% - Unrestricted Indirect Cost Rate for LEA
Maximum Indirect Cost amount for the ARP ESSER Fund
Function/Object Code used on the Budget Grid

SYSTEM PLAN ITEMS RELATED BY FISCAL RESOURCE
Expand All Collapse All

There are currently no Goal or Action Step items associated with this Grant.