eGap
Skip Navigation LinksHome > Funding Applications > Funding Application Sections > ARP ESSER - Application Details
ARP ESSER - Application Details
Attalla City, American Rescue Plan (ARP) ESSER - Fiscal Year 2021 (Rev 0)
 
Go ToExpand Go To



Cover Page & Required Narratives

Superintendent of Schools 
Name*
ARP ESSER Point of Contact 
Name*
Role*
Phone*
Ext
Required Narratives 
How does the LEA plan to use funds to implement prevention and mitigation strategies in order to continuously and safely operate schools for in-person learning?
*

Attalla City Schools will use ARP ESSER Funds to implement prevention and mitigation strategies consistent with CDC guidelines. This will include HVAC improvements designed to improve indoor air ventilation at Etowah Middle School, windows for Attalla Elementary School and Etowah High School. Due to younger student’s inability to be vaccinated and sitting at shared tables, table dividers will be purchased to help mitigate the spread of germs. The District will continue to invest in additional PPE items designed to create a safer environment within the schools.  Finally, the district will purchase additional products aimed at dealing with the COVID-19 virus and ensure the additional products are used by custodial staff in high touch areas within all buildings in the district.


How will the LEA ensure that the evidence-based interventions will address the academic impact of lost instructional time and ensure that those interventions respond to the academic, social, emotional, and mental health needs of all students including underrepresented student subgroups (each major racial and ethnic group, children from low-income families, children with disabilities, English Learners, gender, migrant students, students experiencing homelessness, and children and youth in foster care) and those who are particularly impacted disproportionately by the COVID-19 pandemic?
*

The Attalla City School District remained open for face-to-face instruction starting in August 2020 and stayed open through May 2021. It is important for our district to recognize that the school closures in March 2020-May 2020 also had a negative impact on student learning through the engagement of synchronous and asynchronous learning online. This past school year, the biggest challenge schools faced was due to absences for students and teachers who were subject to quarantine or isolation. In looking at our data, we have identified the students who are not at grade level in the areas of reading and math specifically through the analysis of school based assessments. The district will bring on a new HS Principal and PK-5 Principal to lead efforts with school staff in the 2021-2022 school year to address the learning loss of students and develop multiple research-based strategies to address the learning loss of our students.

Strategies the district will utilize include providing after-school learning opportunities to address loss of learning for students not meeting current grade-level criteria. Summer Learning Academy programs will continue to be supplemented through ARP ESSER funds to continue to address lost instructional time during the 2020-2021 school year for students not meeting academic expectations for 2021-2022. During the after school learning opportunities  and summer learning, students not meeting learning expectations will be engaged with evidence-based programs facilitated by a certified staff members.

Our school district’s primary focus for our PK-12 students will focus on research-based interventions. Our plan is to focus on strengthening our Tier 1 program in 2021-2022 and dive further into Tier 2 and Tier 3 interventions that students need. Using data to drive instruction, academic supplements to engage students in practice, after-school tutoring for academic enrichment, and professional development for staff. Our plan will focus our attention on MTSS systematically as we look to grow and strengthen this program and provide our students the necessary time and financial resources to mitigate learning loss due to the COVID-19 pandemic.


How will the LEA comply with the requirements of section 427 of GEPA (20 U.S.C. 1228a)?
The description must include information on the steps the LEA proposes to take to permit students, teachers, and other program beneficiaries to overcome barriers (including barriers based on gender, race, color, national origin, disability, and age) that impede equal access to, or participation in, the ESSER III program.
*

The LEA commits to putting in place steps to permit students, teachers and other program beneficiaries to overcome barriers (including barriers based on gender, race, color, national origin, disability and age) that might impede equal access to, or participation in, the program. The Attalla City School District will use funds to implement evidence-based strategies to meet the academic needs of all PK-12 students through the implementation of MTSS in grades K-12 focusing on strengthening our core curriculum, implementing staff development programs, engaging in data collection and review of data, providing intervention and supplemental instruction and programs, tutor days, and preparation for life beyond our school district.   We will also provide our student’s additional learning time including after-school and summer programming to best meet the needs of our students and their learning loss during the COVID-19 pandemic.


How will the LEA actively monitor their allocations, conduct interim audits to ensure an appropriate application of funds, collect and manage data elements required to be reported, and report this information to the community?
*

The CSFO will monitor by reconciling monthly expenditures and ES2 forms, conduct necessary audits of the source fund as it is used, pull student data to ensure equitable appropriation, and give monthly board meeting updates as requested. 


How will the LEA meaningfully engage with families and communities throughout the life of the ARP ESSER and other relief funds?
*

The Attalla City School District’s surveys on strategies to implement a safe return to in-person instruction resulted in a variety of responses with a majority citing basic mitigation strategies such as washing of hands, students and staff staying home when they are sick, prioritizing in-person instruction, sanitizing and disinfecting when possible, and not mandating but highly recommending the use of masks. Surveys with stakeholders showed that many believed an increase in small group or one-on-one instruction, after-school tutoring, enrichment, and increased in-person instruction will help the school district address learning gaps caused by loss of instructional time due to COVID-19. The use of counselors, relationship-building, and clear communication were strategies that a majority of stakeholders believed would help address social emotional learning for students. Most stakeholders believed that the greatest positive impact on the Attalla City School District would be a result of increased in-person instructional time, after-school tutoring, increased instructional resources, and increased staffing.  The Attalla City School District will employ a mental health coordinator, an additional ESL paraprofessional, and additional personnel to help mitigate learning loss for all students, but concentrating on our special populations. We also will provide school supplies to all students PK – 12 to help offset the parental burden of purchasing these items. Virtual facilitators will be employed for our high school. Additional CNP and custodial personnel will be employed to help with summer learning.


Provide the URL for the LEA Return-to-Instruction Plan.
*https://www.attalla.k12.al.us/site/Default.aspx?PageID=2238

LEA Reservation to Address Loss of Instructional Time

LEAs must reserve at least 20 percent of funds to address loss of instructional time through the implementation of evidence-based interventions and ensure that those interventions respond to students' social, emotional, and academic needs and address the disproportionate impact of COVID-19 on underrepresented student subgroups.

For this reservation of funds, the following interventions are allowable:
1. Summer Learning & Summer Enrichment Programs
2. Extended Day Programs
3. Comprehensive After-School Programs
4. Extended School Year Programs
5. Other – See Intervention box E for more details.

Budget Amount & Details for Interventions Amount 
Intervention A (Summer Learning & Summer Enrichment Programs)
Intervention B (Extended Day Programs)
Intervention C (Comprehensive After-School Programs)
Intervention D (Extended School Year Programs)
Intervention E (Other)
Total Cost:


Intervention A (Summer Learning & Summer Enrichment Programs) 
Provide the following information for Intervention A (Summer Learning & Summer Enrichment Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to host a Summer Enrichment Camp during the Summer of 2023. The camp will run for two weeks for four days a week. Subjects to be covered are science, technology, engineering, mathematics and reading. We will purchase general supplies such as pencils, notebooks, glue, color pencils, copy paper, etc. to effectively run the program. We will also purchase ELA & Math manipulatives to help improve student achievement. Additionally, we will purchase an online subscription to XYZ Company for the duration of the summer program to assist our participating EL students with the curriculum (See attached job description). Total cost: $109,030.00
[Cont.]
9130 - [010-199] (Salaries) $54,450.00 | 9130 - [200-299] (Benefits) $11,430.00
9130 - [400-499] (Materials and Supplies) $2,800.00 | 9130 - [400-499] (Software) $20,000.00
4120 - [010-199] (Bus Driver Salaries) $12,500.00 | 4120 - [200-299] (Bus Driver Benefits) $3,200.00
4120 - [300-399] (Mileage for Buses) $4,650.00
N/A moved to Category 1 per ALSDE
Intervention B (Extended Day Programs) 
Provide the following information for Intervention B (Extended Day Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
n/a
Intervention C (Comprehensive After-School Programs) 
Provide the following information for Intervention C (Comprehensive After-School Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
n/a
Intervention D (Extended School Year Programs) 
Provide the following information for Intervention D (Extended School Year Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
n/a
Intervention E (Other) 
Provide the following information for Intervention E (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
NOTE: If an LEA chooses to use the "Other" intervention option, the LEA must attach documentation in the Related Documents section that shows that the Intervention is evidence-based (Tier I | Tier II | Tier III | Tier IV).

Flocabulary Program -  ARP ESSER funds will be used to purchase Flocabulary for the 2022-2023 and 2023-2024 school years.  This program is a TIER II evidence based program (Rubric attached). This program is a K-12 supplemental program for vocabulary instruction. Flocabulary is a library of educational videos and learning activities that will be used in the classroom to provide a layer of support for students and to keep them engaged in rigorous content development while building vocabulary, developing 21st century skills, and cultivating literacy across the curriculum.  Total cost: $12,702.22 | 1100 - [311]

APEX Program -  ARP ESSER funds will be used to purchase unlimited additional APEX seats for EMS and EHS for the 2021-2022 school year (Rubric attached). APEX is an online curriculum where students can work on core subject areas off campus with the support of a school facilitators.  Students who are remote, virtual and also recovery basis for students who have missed time due to absence related to illness.  Total cost $7,437.17 | 1100 - [311]

IXL Social Studies Program - ARP ESSER funds will be used to purchase IXL Social Studies add on (Rubric attached). IXL is a digital resource that is used as a diagnostic tool to determine learning loss and academic mastery in all core subjects, it develops an individual learning path for all students and updates their progress as the student moves forward.  It is used as a diagnostic tool not only for students who have been absence but for all students who have experienced learning loss due to the pandemic. Total cost $3,375.00 | 1100 - [311]

PT Intervention Teacher (.50 FTE) - funds to employ 1 part-time Intervention Teacher at AES (.50FTE) (22-23 & 23-24 years) to help identify students who are at risk for academic failure to provide remedial & other suitable instruction for identified students & work w/ students directly in the area of need.  Total: $68,966.40 | 1100 - [018] (Salaries) $64,000| 1100 - [200-299] (Benefits) $4,966.40

Math RTI Coach (1.00 FTE) -  funds to employ 1 Math RTI Coach at AES (1.00FTE) (23-24 year) to help identify students who are at risk for academic failure in math and to provide remedial & other suitable instruction for identified students & work w/ students directly in the area of math.  Total: $86,835.30 | 1100 - [077] (Salaries) $64,261.00| 1100 - [200-299] (Benefits) $22,574.30.

 

Math RTI Coach Additional 20 Days (0.00 FTE) - funds to provide additional 20 days for the Math RTI Coach at AES (0.0FTE) (21-22, 22-23, & 23-24 years) to help identify students who are at risk for academic failure in math and to provide remedial & other suitable instruction for identified students & work w/ students directly in the area of math.  Total: $14,422.80 | 1100- [077] (Salaries) $12,000.00| 1100 - [200-299] (Benefits) $2,422.80.

 

EL Coordinator Additional 20 Days (0.00 FTE) - funds to provide additional 20 days for the EL Coordinator (0.00FTE) (21-22, 22-23, & 23-24 years) to work w/ ELs students to ensure that individual needs are met based on language proficiency levels & reading deficits.  Total: $14,422.80 | 2190 - [081] (Salaries) $12,000.00| 2190 - [200-299] (Benefits) $2,422.80.

Instructional Specialist (1.00 FTE) -  funds to employ 1 Instructional Specialist at EHS (1.00FTE) (21-22, 22-23,&23-24 year) to help identify students who are at risk for academic failure in all core subjects and to provide remedial & other suitable instruction for identified students & work w/ students directly in the areas.  Total: $260,505.87 | 1100-[010] (Salaries) $192,783.00| 1100 - [200-299] (Benefits) $67,722.87

Instructional Specialist Additional 20 Days (0.00 FTE) - funds to provide additional 20 days for the Instructional Specialist at EHS (0.00FTE) (21-22, 22-23, & 23-24 years) help identify students who are at risk for academic failure in all core subjects and to provide remedial & other suitable instruction for identified students & work w/ students directly in the areas.  Total: $14,422.80 | 2190 - [081] (Salaries) $12,000.00| 2190 - [200-299] (Benefits) $2,422.80.

APEX Virtual Facilitators Stipends (0.00 FTE) -  funds to provide a stipend for APEX Virtual Facilitators (0.00FTE) (22023 & 23-24 years) to facilitate & provide instruction for students who receive instruction during the school day and the facilitator will provide additional instruction virtually after hours to address learning loss. Total: $144,228.00 | 2215 - [192] (Salaries) $120,000.00| 2215 - [200-299] (Benefits) $24,228.00.

Instructional Aide (1.00 FTE) - funds to employ 1 Instructional Aide (1.00FTE) at EMS (21-22, 22-23, & 23-24 years) to serve as interventionist to help w/ learning loss for our students resulting from COVID. This aide would pull small groups of students during intervention classes & from computer classes to work on deficient skills. Total: $98,873.19 | 1100 - [101] (Salaries) $58,302.00| 1100 - [200-299] (Benefits) $40,571.19.

Special Education Instructional Aide (1.00 FTE) -  funds to employ 1 Sp Ed Instructional Aide (1.00FTE) at AES (21-22, 22-23, & 23-24 years). Based on individual student’s needs (via IEP, 504, RtI/PST) behavioral interventionist personnel will use pull-out (affective training & positive behavioral supports) & push-in to target student growth in classroom conducive behavior & self-monitoring activities.  The obj. is to ensure students are successful in their least restrictive environment. Total: $105,000.74 | 2190 - [109] (Salaries) $64,045.00| 2190 - [200-299] (Benefits) $40,955.74.

System-Wide Special Education Instructional Aide (1.00 FTE) -  funds to employ 1 System-Wide Sp Ed Aide (1.00FTE) (21-22, 22-23, & 23-24 years). Based on individual student’s needs (via IEP, 504, RtI/PST) behavioral interventionist personnel will use pull-out (affective training & positive behavioral supports) & push-in to target student growth in classroom conducive behavior & self-monitoring activities.  The obj. is to ensure students are successful in their least restrictive environment. Total: $98,212.15 | 1100 - [109] (Salaries) $57,752.00| 1100 - [200-299] (Benefits) $40,460.15.


4. Remaining ARP ESSER Fund Uses

The remaining LEA funds after the LEA Reservation to Address Loss of Instructional Time can be used for a wide range of activities to address needs arising from the COVID-19 pandemic. Please refer to the allowable uses document in the Document Library for more guidance.

Budget Amount & Details for Additional Uses (Include Name for Other Categories) Amount 
Category 1 (Personnel)
Category 2 (Technology & Online Subscriptions)
Category 3 (Facility Improvements)
Category 4 (Professional Development)
Category 5 (Curriculum Materials & Assessments)
Category 6 (Parent & Family Engagement Activities)
Category 7 (Other)
Category 8 (Other)
Category 9 (Other)
Category 10 (Other)
Category 11 (Other)
Category 12 (Other)
Administrative Costs (must be reasonable and necessary)
Indirect Costs (maximum amount is the unrestricted rate)
Total Cost:


Category 1 (Personnel) 
Provide the following information for Category 1 (Personnel):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example #1:
ARP ESSER funds will be used to employ two system-wide EL teachers (2.0 FTE) for the 2021-2022 and 2022-2023 school years to assist with the consistent increase of EL students within the district. In addition to working with students, the EL teachers will work with classroom teachers to ensure appropriate instructional strategies are implemented. (See job description in Related Documents section.)
Total cost: $550,880.00 | 1100 - [010-199] (Salaries) $354,450.00 | 1100 - [200-299] (Benefits) $196,430.00
Example #2:
ARP ESSER funds will be used to employ certified teachers and paraprofessionals for the 2021-2022 and 2022-2023 school years to assist with closing the achievement gap of students within the district. The following list identifies the number of teachers and paraprofessionals at each school: School A - 2 Paraprofessionals (2.0 FTE); School B - 1 Teacher (1.0 FTE) & 1 Paraprofessional (1.0 FTE). (See job description in Related Documents section.)
Total cost: $417,813.00 | 1100 - [010-199] (Salaries) $321,123.00 | 1100 - [200-299] (Benefits) $96,690.00

System Wide IT Specialist (1.00 FTE) - funds to employ 1 System Wide IT Specialist (1.00FTE) (21-22, 22-23, & 23-24) to assist w/ the consistent increase of technology use w/ students & staff due to COVID19. Total: $185,427.13 | 2190 - [139] (Salaries) $131,531.00| 2190 - [200-299] (Benefits) $53,896.13.

EL Instructional Aide (1.00 FTE) - funds to employ 1 EL Instructional Aide (1.00FTE) (21-22, 22-23, & 23-24 years) Based on individual student’s needs (I-ELP’s) EL personnel will use pull out (language proficiency lessons) & push in to target student growth in language proficiency & academics, the obj is to ensure students are successful in the least restrictive environment.  EL Staff will collaborate w/ teachers to ensure that ELs are engaged in language & academics, & I-ELP goals are being met & develop lessons that will target long term needs. This is in addition to the normal instruction the students receive. Total: $98,226.02 | 1100 - [101] (Salaries) $58,302.00| 1100 - [200-299] (Benefits) $39,924.02.

EL Teacher Stipend (0.00 FTE) - funds to provide a stipend for an EL Teacher (0.00FTE) (23-24 year) to provide after hour/summer assistance w/ interpreting, proofreading & ACCESS testing for the system.  Total: $3,004.75 | 2215 - [192] (Salaries) $2,500.00| 2215 - [200-299] (Benefits) $504.75.

Computer Science Training Stipend (0.00 FTE) - funds to provide a stipend for computer science summer PD (0.00FTE) (2021 summer) for 5 days for 1 teacher to attend the E3 Computer Science Training. Total: $1,560.13 | 2215 - [192] (Salaries) $1,300.00| 2215 - [200-299] (Benefits) $260.13.

Category 2 (Technology & Online Subscriptions) 
Provide the following information for Category 2 (Technology & Online Subscriptions):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase Chromebooks, Chromebook carts, document cameras, and touch screen panels to increase academic technology usage and improve student achievement. ARP ESSER funds will also purchase a subscription to ABC (all subscriptions will expire prior to September 30, 2024).
Total Cost: $432,158.00 | 1100 - [300-399] (Software License) $30,000.00 | 1100 - [400-499] (Technology) $402,158.00

ARP ESSER funds will be used to purchase the following technology items to supplement classroom instruction.  Interactive Panels (5) $17,820.00; Microsoft Surface Pros (6) $6,317.10; 55” TV w/ mounting brackets (1), chromebox (1), wireless keyboard & mouse (1), web camera (1), & cables $900.00; 65” Mimio Boards (3) $7,047.00.   ARP ESSER funds will also be used to purchase a subscription to Blackboard Connect (used system wide to communicate in a timely manner w/ our stakeholders) $39,000 (all subscriptions will expire prior to September 30, 2024).  Total: $71,084.10| 1100 - [300-399] (Software License) $39,000.00 | 1100 - [400-499] (Technology) $32,084.10

Category 3 (Facility Improvements) 
Provide the following information for Category 3 (Facility Improvements):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to replace 3 air conditioner units at ABC Elementary School, install 2 new air conditioner units at EFG Middle School, and repair 1 air conditioner unit at IJK High School. All services will be completed by June 2024. Total Cost: $55,500.00
7200 - [500-599] (Capitalized Units) $18,500.00 | 3200 - [400-499] (Non-Capitalized Units and Supplies for Repairs) $37,000.00

In a time when air quality is essential, having a school building that is encapsulated is imperative in order to ensure the building has clean air.  Fixing these exterior windows allows for that to happen.  Based on the safety of our students these windows should remain sealed at all times and currently they are not capable of doing so.  ARP ESSER funds will be used to repair windows at Etowah High School and windows at Attalla Elementary School.  Repair and replace HVAC units system wide, and provide COVID19 Dividers at Attalla Elementary School for PK-5 students.  All services will be completed by June 2024.  Total Cost: $524,648.00 | 7200 – [500-599] (Capitalized Building Improvements Windows) $450,000. | 3200 – [300-399] (Non Capitalized Units and Supplies for Repairs) $74,648.00.

Category 4 (Professional Development) 
Provide the following information for Category 4 (Professional Development):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to provide ongoing, high quality professional development for administrators, teachers, and other instructional staff that support increased student achievement in all core subject areas.
- Consultants: Our mathematics adoption textbook company (ABC Company) will provide high quality professional development in October 2021 and December 2021 to all teachers within the LEA to prepare them for the COS adoption. Total Cost: $14,000.00 | 2215 - [300-399] (Consultants) $14,000
- Stipends: Teachers and other instructional support staff will be provided a stipend to participate in professional development that is outside of their contracted hours during the Spring of 2022. Total Cost: $19,230.00 | 2215 - [010-199] (Stipends) $11,456.00 | 2215 - [200-299] (Benefits) $7,774.00
[Cont.]
- Substitutes: Teachers will work collaboratively during the school day to develop curriculum maps and common formative assessments once a quarter for the 2022-2023 school year for a total of 4 days. Our LEA uses ABC Company for subs, so all subs are contractual, and no benefits are provided. Total Cost: $18,000.00 | 2215 - [300-399] (Contract for Subs) $18,000
- Materials and Supplies: General supplies will be needed for all professional development sessions to include but not limited to chart paper, easels, paper, notebooks, pens, pencils, markers, colored pencils, etc. Total Cost: $3,400.00 | 2215 - [400-499] (Supplies & Materials) $3,400.00
[Cont.]
- Conference Attendance: 6 Teachers & 2 Administrators will attend the MEGA Conference (Mobile, AL) in July 2022 to be provided professional development from the ALSDE to support student achievement. Travel costs will include hotel, per diem, and mileage. Total Cost: $22,000.00 | 2215 - [600-899] (Registration) $4,000.00 | 2215 - [300-399] (Travel) $18,000.00

ARP ESSER funds will be used to provide ongoing, high quality professional development for administrators, teachers, & other instructional staff that support increased student achievement in all core subject areas.  The Professional development will be spread out over the three years 2021-2022, 2022-2023, & 2023-2024.  Listed below are more details. Total: $51,358.40 | 2190 – [399] $21,849.00. | 2215 – [300-399] $29,509.40

1.    Special Education Behavioral Support – Teachers & Administration will receive ongoing training to identify behavioral needs in students, develop plans to address these needs, implement the behavioral plans, & evaluate student progress toward behavioral goals, & make adjustments as needed.  Contract w/ Coosa Behavioral Services at an estimated a cost of $3,600.00 ($1,200.00 for each school year)

2.    Special Education PD for Behavior Modification training –Exp& PD for behavior modification (MCS [restraint] & De-escalation training) quote for $18,249.00 ($6,083.00 per year)

3.    Travel & Registration for PD for the following to be spread out over the 3 years -  Staff will acquire high quality PD via AMSTI, ARI, SED/CLAS/SRB PD, Core Academic Course of Study PD, Social & Emotional Behavior whole education series (modules), Alabama Best Practice (KLN & PCN) vendor sponsored activities, book-study activities, &/or model site visits as shown by PD & sign in sheets, staff evaluations, observation via classroom walk-throughs that result in improved student performance as shown by student data.

a.    1 Special Education Director -  $9,000.00

b.    1 EL Coordinator - $6,000.00

c.    1 Mental Health Service Coordinator - $6,000.00

d.    1 Federal Programs Director - $1,700.00

e.    1 Curriculum Director - $1,700.00

f.     1 General Student Services, Transportation, Maintenance, & CNP Director - $2,000.00

g.    1 Technology Director - $2,000.00

h.    1 Superintendent - $1,109.40

Category 5 (Curriculum Materials & Assessments) 
Provide the following information for Category 5 (Curriculum Materials & Assessments):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase assessment supplies and materials to help provide real time data to increase student achievement. These will include actual assessments and general supplies. All services will be purchased by the end of the 2021-2022 school year.
Total Cost: $8,791.00 | 2130 - [400-499] (Assessment Supplies & Materials) $8,791.00
ARP ESSER funds will be used to purchase student classroom supplies and materials to help increase student achievement.  These will be purchased in all three school years, 2021-2022; 2022-2023; and 2023-2024.  Total Cost: $157,926.93 | 1100 – [411] $157,926.93
Category 6 (Parent & Family Engagement Activities) 
Provide the following information for Category 6 (Parent & Family Engagement Activities):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase family handouts and resources for our Family Literacy Night in 2021 and 2022. The resources will include ELA and Math manipulatives and supplies needed to create family activities.
Total Cost: $4,500.00 | 2190 - [400-499] (Supplies and Materials) $4,500.00
N/A
Category 7 (Other) 
Provide the following information for Category 7 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)

ARP ESSER funds will be used to help purchase contract services for special education students & supplies for our nurses & mental health service coordinator.  Total: $200,568.10 | 2190 [300-399] $146,000.00 | 2140 [400-499] $38,593.02 | 2190 [400-499] $15,975.08

·         Special Education Contract Services (0.00 FTE) - ARP ESSER funds will be used to purchase contract services for special education students such as OT/PT & behavior services.  This will be a total cost of $146,000.00 (10,000 years 21-22) (68,000.00 years 22-23) ($68,000.00 year 23-24). 

·         Nurse Supplies (0.00 FTE) – ARP ESSER funds will be used to purchase PPE, clinical supplies based on monitoring (vinyl recliners, stationary ice machines for each nurse station, & lockable medication boxes for inside lockable cabinets) & medical supplies for system nurses in order to mitigate COVID19.  Total Cost $38,593.02 for school years 2021-2022, 2022-2023, & 2023-2024.

·         Mental Health Service Coordinator Supplies (0.00 FTE) – supplies to work w/ the students & staff for emotional & social health (sensory kits for each school, student supplies to promote social & emotional health, etc.).  Total Cost $15,975.08 for school years 2021-2022, 2022-2023, & 2023-2024.

Category 8 (Other) 
Provide the following information for Category 8 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 9 (Other) 
Provide the following information for Category 9 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 10 (Other) 
Provide the following information for Category 10 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 11 (Other) 
Provide the following information for Category 11 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A
Category 12 (Other) 
Provide the following information for Category 12 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
N/A


Administrative Costs 
Program Administration must be reasonable and necessary in order to manage the federal grant in a compliant and effective manner.*
Provide a summary of how the grant program will be administered, including the title of the staff responsible for the grant administration, the FTE(s), and other funding sources (if applicable) that will contribute to administrative staff salaries/benefits. Additionally, the description must include all estimated costs, match the administrative costs dollar amount listed above, and include the Function and Object codes associated with the charge.
N/A


Indirect Costs 
Indirect Costs represent the expenses of doing business that are not readily identified with the ARP ESSER but are necessary for the general operation of the organization and the conduct of activities it performs. These costs must be reasonable and necessary, and LEAs can use the unrestricted indirect cost rate for calculation.*
% - Unrestricted Indirect Cost Rate for LEA
Maximum Indirect Cost amount for the ARP ESSER Fund
Function/Object Code used on the Budget Grid

SYSTEM PLAN ITEMS RELATED BY FISCAL RESOURCE
Expand All Collapse All

There are currently no Goal or Action Step items associated with this Grant.