eGap
Skip Navigation LinksHome > Funding Applications > Funding Application Sections > ARP ESSER - Application Details
ARP ESSER - Application Details
Wilcox County, American Rescue Plan (ARP) ESSER - Fiscal Year 2021 (Rev 0)
 
Go ToExpand Go To



Cover Page & Required Narratives

Superintendent of Schools 
Name*
ARP ESSER Point of Contact 
Name*
Role*
Phone*
Ext
Required Narratives 
How does the LEA plan to use funds to implement prevention and mitigation strategies in order to continuously and safely operate schools for in-person learning?
*

The Wilcox County Public School System will use ESSER III funds to implement prevention and mitigation strategies that are, to the greatest extent practicable, consistent with the most recent Centers for Disease Control and Prevention (CDC) guidance on reopening schools, in order to continuously and safely open and operate schools for in-person learning. ACPS will use a portion of its ARP Act ESSER III funds to implement the following prevention and mitigation strategies:

Improve ventilation in buildings and on school buses;

Provide personal protective equipment (PPE) for staff, students and visitors; and

Purchase System-Wide Software to make documents available online for employees and visitors to help reduce person to person contact

Purchase desks and store excess furniture to allow for social distancing in classrooms.

Pay for professional building sanitation services

Purchase thermometers and thermal scanners to check temperatures of visitors and students

This funding will be used in conjunction with other funding sources to fully implement additional recommended prevention and mitigation strategies, including enhanced cleaning and disinfection, hand sanitation, contact tracing, tents to maximize outdoor spaces, etc

How will the LEA ensure that the evidence-based interventions will address the academic impact of lost instructional time and ensure that those interventions respond to the academic, social, emotional, and mental health needs of all students including underrepresented student subgroups (each major racial and ethnic group, children from low-income families, children with disabilities, English Learners, gender, migrant students, students experiencing homelessness, and children and youth in foster care) and those who are particularly impacted disproportionately by the COVID-19 pandemic?
*

We will be allocating resources in ways that advance equity and ensuring they are adequate for providing the opportunities and supports students need to succeed is particularly important as we recover from the disparate impact of COVID-19 on different communities of ethnicity and communities experiencing poverty. Addressing the many dimensions of resource equity, including equitable and adequate school funding, access to a well-rounded education, well-prepared, effective, and diverse educators and staff, and integrated support services, can begin to mitigate the impact of COVID-19 on schools and students and can close long-standing gaps in educational opportunity.  We will continue to use practices that have been implemented from our ESSER II plan such as extended day, summer school, additional fte's, and classroom supplies.  We are a district with a high level of poverty, so we will continue to implement current measures to serve those impacted by COVID-19.  Every effort will be made to ensure homeless students will not be stigmatized and/or alienated due to their status. All referrals will be confidential and identification of homeless status will not be included on the student's permanent record

Section 2001(e)(1) of the ARP Act requires each Local Education Agency (LEA) to use at least 20% of its formula funds to address the academic impact of lost instructional time (learning loss) through the implementation of evidence-based interventions, such as summer learning & enrichment, extended day, comprehensive after-school programs, or extended school year programs. ACPS will use no less than 20% of its ARP Act ESSER III funds to address unfinished learning as described below:

  • Provide expanded academic and enrichment programming for summer 2023 and summer 2024
  • Extended Day programs during the school year

Hire additional staff (Interventionist, Instructional Aides, and a Reading Specialist)

How will the LEA comply with the requirements of section 427 of GEPA (20 U.S.C. 1228a)?
The description must include information on the steps the LEA proposes to take to permit students, teachers, and other program beneficiaries to overcome barriers (including barriers based on gender, race, color, national origin, disability, and age) that impede equal access to, or participation in, the ESSER III program.
*

The Wilcox County Board of Education already has policies in place to prevent barriers in regards to race, gender, color, nationality, disability, and age.  We will continue to implement these measures in all programs that are offered by the district.

Wilcox County Board of Education will remove barriers for all students, teachers, and other staff (regardless of gender, race, ethnicity, disability, and age) by promoting a culture of belonging, safety, and self-worth, which supports equal access for all individuals.  If barriers arise within the district, we will address them in an efficient and effective manner.

How will the LEA actively monitor their allocations, conduct interim audits to ensure an appropriate application of funds, collect and manage data elements required to be reported, and report this information to the community?
*

The Wilcox County Board of Education will administer each program by the application in accordance with all applicable statutes, regulations, program plans, and applications.  The control of funds provided to the local educational agency under ESSER III, and will administer those funds and property;

The Board of Education will make reports to the State agency or board and to the Secretary as may reasonably be necessary to enable the State agency or board and the Secretary to perform their duties and that the local educational agency will maintain such records, including the records required under section 443, and provide access to those records, as the State agency or board or the Secretary deem necessary to perform their duties.  The local educational agency will use fiscal control and fund accounting procedures that will ensure proper disbursement of, and accounting for, Federal funds paid to that agency under each program

How will the LEA meaningfully engage with families and communities throughout the life of the ARP ESSER and other relief funds?
*

A parental involvement advisory committee composed of representatives from the community, parents, students, teachers, and administrators involved in all Federal Programs was formed to revise the LEA Parental Involvement Plan.  Committee representatives were selected because of their dedication and interest in the success of our students and school. 

 

The required annual meetings are held at each school independent of other meetings, such as PTA.
Input from parents and community members is actively sought in order to ensure that both parent and student needs are identified and that all available community resources are being utilized.  The focus of Wilcox County Schools' Parent Involvement Plan is to involve parents in the educational process of their children through activities, communication, school activities, and volunteer programs.  Throughout the year, goals and progress are communicated to stakeholders through PTA meetings, local school staff meetings, newsletters, and the local media, so that there is a shared commitment for a quality education for all students in Wilcox County Schools.

 

A copy of the Wilcox County Schools Parent Involvement Policy (Appendix A) and Plan will be located in the Superintendent's office, Federal Program Director's office, and in each school's front office for review.  A copy of the Parental Involvement Policy and Plan will be distributed to students to be hand delivered to parents.  Procedures are outlined in the Wilcox County Schools' Parent Involvement Policy that allows all parents to make and submit concerns about the Parent Involvement Policy/Plan or Local Education Association Consolidated Application to the Principal.  If these concerns are not addressed to the satisfaction of the parent, the parent may submit in writing these concerns to the Federal Programs Director who will in turn forward them to the Federal Programs Director at the State Department of Education

Provide the URL for the LEA Return-to-Instruction Plan.
*www.wilcox.k12.al.us

LEA Reservation to Address Loss of Instructional Time

LEAs must reserve at least 20 percent of funds to address loss of instructional time through the implementation of evidence-based interventions and ensure that those interventions respond to students' social, emotional, and academic needs and address the disproportionate impact of COVID-19 on underrepresented student subgroups.

For this reservation of funds, the following interventions are allowable:
1. Summer Learning & Summer Enrichment Programs
2. Extended Day Programs
3. Comprehensive After-School Programs
4. Extended School Year Programs
5. Other – See Intervention box E for more details.

Budget Amount & Details for Interventions Amount 
Intervention A (Summer Learning & Summer Enrichment Programs)
Intervention B (Extended Day Programs)
Intervention C (Comprehensive After-School Programs)
Intervention D (Extended School Year Programs)
Intervention E (Other)
Total Cost:


Intervention A (Summer Learning & Summer Enrichment Programs) 
Provide the following information for Intervention A (Summer Learning & Summer Enrichment Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to host a Summer Enrichment Camp during the Summer of 2023. The camp will run for two weeks for four days a week. Subjects to be covered are science, technology, engineering, mathematics and reading. We will purchase general supplies such as pencils, notebooks, glue, color pencils, copy paper, etc. to effectively run the program. We will also purchase ELA & Math manipulatives to help improve student achievement. Additionally, we will purchase an online subscription to XYZ Company for the duration of the summer program to assist our participating EL students with the curriculum (See attached job description). Total cost: $109,030.00
[Cont.]
9130 - [010-199] (Salaries) $54,450.00 | 9130 - [200-299] (Benefits) $11,430.00
9130 - [400-499] (Materials and Supplies) $2,800.00 | 9130 - [400-499] (Software) $20,000.00
4120 - [010-199] (Bus Driver Salaries) $12,500.00 | 4120 - [200-299] (Bus Driver Benefits) $3,200.00
4120 - [300-399] (Mileage for Buses) $4,650.00

ARP ESSER funds will be used to host Summer Enrichment & Learning Camps.  The camps will run for 5 weeks for 4 days a week

The Wilcox County School System will address learning loss/gaps in the English language arts and math curriculum through summer learning programs with the use of approved district wide English language arts and math Interventions such as S.P.I.R.E., IXL, STA, and other resources. These programs meet students directly at their learning needs through assessment and instruction.  This will be for Summer 2023 and Summer 2024

All Summer Feeding Funds have been utilized.  The district will provide the remaining amount to pay for the summer learning workers. Any stipends for staff will be paid for work performed off-contracted time.

Summer School $1,010,772.00 (2 Summers):

All school sites 45 Teachers, 5 Counselors, 5 Nurses, 1 RN, 6 Instr. Aides, 5 Custodians, 25 Bus Drivers, 10 CNP, & 6 Administrators

Function 9130 - Object (010-199) Salaries $821,500.00 & Function 9130 - Object(200-299) Benefits $166,272.00

All school sites Classroom / Function 9130 - Object(400-499) Supplies $23,000.00

Intervention B (Extended Day Programs) 
Provide the following information for Intervention B (Extended Day Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)

The Wilcox County School System will address learning loss/gaps in the English language arts and math curriculum through extended day tutoring programs with the use of approved district wide English language arts and math Interventions such as S.P.I.R.E., IXL, STA, and other resources. These programs meet students directly at their learning needs through assessment and instruction.

o   The hours will be from Tuesday – Thursday from 3:15pm – 5:15pm from September through April during fiscal year 2023-2024.  ESSER II will fund the previous fiscal years.

o   Any stipends for staff will be paid for work performed off-contracted time.

High Dosage Tutoring (Extended Day) $697,768.00:

August 2022 – April 2023 4 Days per week

All school sites 40 Teachers, 5 Counselors, 5 Nurses, 5 Custodians, 21 Bus Drivers & 6 Administrators

9130 - (010 - 199) Salaries $580,313.00 & 9130 - (200-299)  Benefits $117,455.00

Intervention C (Comprehensive After-School Programs) 
Provide the following information for Intervention C (Comprehensive After-School Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Intervention D (Extended School Year Programs) 
Provide the following information for Intervention D (Extended School Year Programs):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Intervention E (Other) 
Provide the following information for Intervention E (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
NOTE: If an LEA chooses to use the "Other" intervention option, the LEA must attach documentation in the Related Documents section that shows that the Intervention is evidence-based (Tier I | Tier II | Tier III | Tier IV).

Educational Intervention & Learning Loss Recovery:  Total Cost $418,565.00

ARP ESSER funds will be used to employ personnel to promote learning recovery (8.0 FTE) for the 2023-2024 years to assist with students struggling academically within the district. The reading coaches, interventionists, and paraprofessionals will work with struggling students in the areas of credit recovery, small group instruction, pull out tutoring, and to ensure that struggling students are comprehending content/instructional strategies. (See job description in Related Documents section.)

Total cost: $314,875.00 |

1100 - [010-199] (Salaries) $153,000.00 / 1100 - [200-299] (Benefits) $98,167.00  | 2120 - [010-199] (Salaries) $45,000.00 / 2120 - [200-299] (Benefits) $18,708.00

o     1 Reading Coach (ABC Elementary) / Function 1100 - Object(084) $45,000.00 Salary and Function 1100 - Object(200-299) $18,708.00 Benefits

o     1 Interventionist (WCHS) / Function 2120 - Object(129) $45,000.00 Salary and Function 1100 - Object(200-299) $18,708.00 Benefits

o    6 Paraprofessionals (Aides) /  Function 1100 - Object(101) $108,000.00 Salaries and Function 1100 - Object(200-299) $79,459 Benefits 

o   Reading Coach – Category 1

§  There were two schools (ABC Elem. and FS Ervin Elem.) that share a Reading Coach.  This will allow for both schools to have a full time Reading Coach so that they can be available full time at both schools to help struggling students recover in regards to reading.

o   Interventionist – Category 1

§  Interventionist will work directly with high school students that are in danger of failing.  They will work with them to recover in areas that they are struggling academically to increase graduation and passing rates.

o   Paraprofessionals – Category 1

§  Instructional Aides that will help assist teachers and facilitate learning recovery with students who have the highest need of intervention at every school.  

o   Software – Category 2

§  All of the software that we are investing in will be used by staff at all schools to help foster academic recovery.  All versions of the programs are designed for schools that need academic intervention.  This software was requested by our educators based on what they can provide in assisting with the academic recovery process. The software programs will be used with the Interventions included in Intervention A, B, and E.

ABC Elementary – 1 Aide

J.E. Hobbs Elementary – 2 Aides

F.S. Ervin Elementary – 1 Aide

Camden School of Arts & Technology (Middle School) – 1 Aide

Wilcox Central High School – 1 Aide

1100 - (414) Educational & Intervention Software $103,690.00 (Subscriptions will run from August 2023-September 2024

o   Edgenuity (Grades 9-12) $38,695.00

o   We Build it Better (Grades 6-8) $32,500.00

o   IXL Learning (Grades K-8) $32,495.00

 


4. Remaining ARP ESSER Fund Uses

The remaining LEA funds after the LEA Reservation to Address Loss of Instructional Time can be used for a wide range of activities to address needs arising from the COVID-19 pandemic. Please refer to the allowable uses document in the Document Library for more guidance.

Budget Amount & Details for Additional Uses (Include Name for Other Categories) Amount 
Category 1 (Personnel)
Category 2 (Technology & Online Subscriptions)
Category 3 (Facility Improvements)
Category 4 (Professional Development)
Category 5 (Curriculum Materials & Assessments)
Category 6 (Parent & Family Engagement Activities)
Category 7 (Other)
Category 8 (Other)
Category 9 (Other)
Category 10 (Other)
Category 11 (Other)
Category 12 (Other)
Administrative Costs (must be reasonable and necessary)
Indirect Costs (maximum amount is the unrestricted rate)
Total Cost:


Category 1 (Personnel) 
Provide the following information for Category 1 (Personnel):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example #1:
ARP ESSER funds will be used to employ two system-wide EL teachers (2.0 FTE) for the 2021-2022 and 2022-2023 school years to assist with the consistent increase of EL students within the district. In addition to working with students, the EL teachers will work with classroom teachers to ensure appropriate instructional strategies are implemented. (See job description in Related Documents section.)
Total cost: $550,880.00 | 1100 - [010-199] (Salaries) $354,450.00 | 1100 - [200-299] (Benefits) $196,430.00
Example #2:
ARP ESSER funds will be used to employ certified teachers and paraprofessionals for the 2021-2022 and 2022-2023 school years to assist with closing the achievement gap of students within the district. The following list identifies the number of teachers and paraprofessionals at each school: School A - 2 Paraprofessionals (2.0 FTE); School B - 1 Teacher (1.0 FTE) & 1 Paraprofessional (1.0 FTE). (See job description in Related Documents section.)
Total cost: $417,813.00 | 1100 - [010-199] (Salaries) $321,123.00 | 1100 - [200-299] (Benefits) $96,690.00

ARP ESSER funds will be used to employ personnel to promote Building Sanitation and routine cleaning.  They will be budgeted for Fiscal Years 2021-2022, 2022-2023.  This will expire Fiscal Year 2023-2024.

We will be using our staff to clean the buildings with sanitation equipment and supplies provided by the district.

13 custodians at 13.0 FTEs at 6 Locations District-Wide will be hired (3 Fiscal Years)

Total Cost: $1,123,407.00 |

 

3200 - 171 Custodian/Janitors Salaries $257,350 X 3 = $772,050.00 | 3200 - [200-299] Benefits $117,119 x 3 = $351,357.00

Category 2 (Technology & Online Subscriptions) 
Provide the following information for Category 2 (Technology & Online Subscriptions):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase Chromebooks, Chromebook carts, document cameras, and touch screen panels to increase academic technology usage and improve student achievement. ARP ESSER funds will also purchase a subscription to ABC (all subscriptions will expire prior to September 30, 2024).
Total Cost: $432,158.00 | 1100 - [300-399] (Software License) $30,000.00 | 1100 - [400-499] (Technology) $402,158.00

ARP ESSER funds will be used to purchase Chromebooks, Laptops, smart boards, and associated accessories to improve academic technology usage and Student achievement.  We will need additional funds to pay for Tech Support Services to assist IT District Coordinator.  ARP ESSER funds will also purchase subscriptions for Microsoft Office & Anti-virus that will expire prior to September 30, 2024

Tech Support Contracted Services October 1, 2021 – September 30,  2024

Total Cost: $813,000.00 | 1100 - [300-399] (Software License & Tech Support) $188,000.00 | 1100 - [400-499] (Technology) $625,000.00

Category 3 (Facility Improvements) 
Provide the following information for Category 3 (Facility Improvements):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to replace 3 air conditioner units at ABC Elementary School, install 2 new air conditioner units at EFG Middle School, and repair 1 air conditioner unit at IJK High School. All services will be completed by June 2024. Total Cost: $55,500.00
7200 - [500-599] (Capitalized Units) $18,500.00 | 3200 - [400-499] (Non-Capitalized Units and Supplies for Repairs) $37,000.00

ARP ESSER funds will be used to improve Air Quality via Facility Improvements:

HVAC/BAS Upgrades/Electrical Infrastructure

Many of the heating, ventilation, and cooling systems in Wilcox County Schools are currently failing and in desperate need of replacement. Many units have already failed, and others experience several issues and are past the end of their useful life. Without many units operating properly, the HVAC systems cannot provide comfortable space temperatures nor dehumidify for space comfort during the warmer months.

The ESSER funds will procure a new turnkey mechanical equipment solution on an as needed basis, threw new variable speed fans, two-stage compressors, bipolar ionization, and associated materials. We will redesign and replace the systems to improve indoor air quality, increase building occupant comfort, and increase reliability to address this critical infrastructure need. The goal at the forefront of this undertaking is to significantly reduce the risk of Covid-19 by ensuring outside air requirements are being met to provide a safer environment.  
*******We already have $1,164,858.00 Budgeted in our ESSER II plan for Facility Improvements so that will affect how much we budget in ESSER III.*******

Total Cost: $4,850,000.00 | 7200 - [500-599] (Capitalized Units) $4,800,000.00 | 3200 - [400-499] (Non-Capitalized Units and Supplies for Repairs) $50,000.00

To be included: Replacement of failed Water source heat pumps at Wilcox Central HS. Renovate units at the gymnasium 4 of the six units are failing at Wilcox Central HS. Renovate the auditorium at Wilcox Central HS to install a new A/C and heating system to improve air quality and prevent/mitigate the spread of COVID-19. Install new rooftop unit in the foyer at Wilcox Central HS. Replace cafeteria area and kitchen units at Wilcox Central HS. Replace main office unit at Wilcox Central HS. Replace stadium field house units that have failed Wilcox Central HS. Replace units serving the special needs classrooms at Wilcox Central HS. Replace wall packs to improve classroom comfort at CSAT. Auditorium split-systems to be replaced at CSAT. Steam boiler Demolition due to lack of need at CSAT.  They will replace the current failed A/C units then remove the old units including the boiler.  This will cut down on the moisture levels that is causing mold issues.

Implement a new District-wide Building automation system in all 7 of the district facilities. Enable maintenance to be proactive in correcting issues through alarms and alerts that indicate emerging issues.

Centrally monitor and control temperatures; easily schedule buildings; full Direct Digital Control (DDC) of all district HVAC equipment

The cost of these upgrades is anticipated to be between $5.2M and $5.8M depending on the scope of work and fluctuation in material and labor costs.

 Building Envelope

Seal all penetration points in and around the building to ensure proper indoor air quality is being achieved. In addition, add door sweep and replace windows where necessary to ensure a comfortable and safe learning environment.  All locations except for the central office.

The cost of these upgrades is estimated to be between $110K - $120K depending on the upgrades made.

Category 4 (Professional Development) 
Provide the following information for Category 4 (Professional Development):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to provide ongoing, high quality professional development for administrators, teachers, and other instructional staff that support increased student achievement in all core subject areas.
- Consultants: Our mathematics adoption textbook company (ABC Company) will provide high quality professional development in October 2021 and December 2021 to all teachers within the LEA to prepare them for the COS adoption. Total Cost: $14,000.00 | 2215 - [300-399] (Consultants) $14,000
- Stipends: Teachers and other instructional support staff will be provided a stipend to participate in professional development that is outside of their contracted hours during the Spring of 2022. Total Cost: $19,230.00 | 2215 - [010-199] (Stipends) $11,456.00 | 2215 - [200-299] (Benefits) $7,774.00
[Cont.]
- Substitutes: Teachers will work collaboratively during the school day to develop curriculum maps and common formative assessments once a quarter for the 2022-2023 school year for a total of 4 days. Our LEA uses ABC Company for subs, so all subs are contractual, and no benefits are provided. Total Cost: $18,000.00 | 2215 - [300-399] (Contract for Subs) $18,000
- Materials and Supplies: General supplies will be needed for all professional development sessions to include but not limited to chart paper, easels, paper, notebooks, pens, pencils, markers, colored pencils, etc. Total Cost: $3,400.00 | 2215 - [400-499] (Supplies & Materials) $3,400.00
[Cont.]
- Conference Attendance: 6 Teachers & 2 Administrators will attend the MEGA Conference (Mobile, AL) in July 2022 to be provided professional development from the ALSDE to support student achievement. Travel costs will include hotel, per diem, and mileage. Total Cost: $22,000.00 | 2215 - [600-899] (Registration) $4,000.00 | 2215 - [300-399] (Travel) $18,000.00

ARP ESSER funds will be used to provide ongoing, high quality professional development for administrators, teachers, and other instructional staff that support increased student achievement in all core subject areas.

The district will most likely have 50 instructional staff members district wide to receive ongoing professional development beginning in the 2023 fiscal year and ending September 2024.  This will be provided in addition to our ESSER II funds.

Total Cost: $80,000.00 | 2215 - [010-199] (Stipends) $16,650.00 | 2215 - [200-299] (Benefits) $3,350.00 / 2215 - [300-399] (Purchase Services) $20,000.00 | 2215 - [623] (Registration) $20,000.00 | 2215 - [400-499] (Training Supplies) $20,000.00

ELA HQPD $40,000.00:

PD Registrations, Subs & Stipends, In-state & Out of State Travel, and HQ PD Supporting Materials and Supplies.  Training will be used to train staff on K-12 Content, Depth of Knowledge and Learning Priorities.

Math HQPD $40,000.00:

PD Registrations, Subs & Stipends, In-state & Out of State Travel, and HQ PD Supporting Materials and Supplies.  Training will be used to train staff on K-12 Content, Depth of Knowledge and Learning Priorities.

§  Consultants for school staff (Attached)

§  Conferences and In-house sessions

§  Training will be done during contract and off contract time for staff. Any stipends for staff will be paid for work performed off-contracted time.

§  Registration Fees

§  Hotel Accommodations

§  Mileage and Incidentals

§  We will pay for both in-state and out-of-state travel

§  Materials purchased will be booklets, printouts, and software used by trainers and staff.

§  In-state and out-of-state travel

§  Consultants for Staff

Trainers 

 

 

Category 5 (Curriculum Materials & Assessments) 
Provide the following information for Category 5 (Curriculum Materials & Assessments):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase assessment supplies and materials to help provide real time data to increase student achievement. These will include actual assessments and general supplies. All services will be purchased by the end of the 2021-2022 school year.
Total Cost: $8,791.00 | 2130 - [400-499] (Assessment Supplies & Materials) $8,791.00

ARP ESSER funds will be used to purchase curriculum materials & assessment supplies and materials to help provide real time data to increase student achievement. These will include actual assessments and general supplies. All services will be purchased by the end of the 2023-2024 school year.
Total Cost: $25,000.00 | 2130 - [400-499] (Assessment Supplies & Materials) $25,000.00

Assessments, Inclusive of Screeners $25,000.00:

Social/Emotional/Behavioral – Connors Scale & BASC Software &10,000.00

 The Conner’s and BASC-3 behavioral programs will provide valuable mental health data on student behavior to address/assess related learning, behavior, and emotional problems in children and teens.

Other – ACAP, ACT, WIDA, KUDER Software & Testing Supplies $15,000.00

Category 6 (Parent & Family Engagement Activities) 
Provide the following information for Category 6 (Parent & Family Engagement Activities):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)
Example:
ARP ESSER funds will be used to purchase family handouts and resources for our Family Literacy Night in 2021 and 2022. The resources will include ELA and Math manipulatives and supplies needed to create family activities.
Total Cost: $4,500.00 | 2190 - [400-499] (Supplies and Materials) $4,500.00
ARP ESSER funds will be used to purchase family handouts and resources for our families during fiscal years 2023 and 2024. The resources will include ELA and Math manipulatives and supplies needed to create family activities.
Total Cost: $5,000.00 | 2190 - [400-499] (Supplies and Materials) $5,000.00
Category 7 (Other) 
Provide the following information for Category 7 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)

District will use ARP ESSER Funds to support students and staff with Mental Health Services in addition to School Counselors and Mental Health Coordinator.  This will be provided through September 2024

Peer-Helpers Subscription and Mental Health Support Services | Function 2150 - Object(300-399) $70,000.00

§  The program covers many of the issues that affect our youth today, such as: bullying, divorce, family illness, body image, grief and coping, mental health and depression

o   Mental Health Support Services (Mental Health Coordinator)

“Preparing Our Kids for Success”, is a onetime, 2.5-hour parent class specifically designed to strengthen the School Attendance Policy and local truancy deduction efforts by helping to reduce chronic truancy and improve school performance.

 

Category 8 (Other) 
Provide the following information for Category 8 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)

District will use ARP ESSER Funds to support students and staff so support Special Education.  This will be provided through September 2024.

Total Cost: $70,000.00 | 1100 - [400 - 499] Materials & Supplies $30,000.00 | 2130 - [300-399] Purchased Services $25,000.00 | 2130 - [400-499] (Supplies and Materials) $15,000.00

Special Education Transitional Services – Brigance & Pro-Ed Transition Assessment Software $15,000 | Licensed Therapist $25,000.00 | Materials & Supplies $30,000.00

The School District already has an open/active contract with Delta Rehab and Lymphedema Therapy Solutions to provide Licensed Therapist services.

o   Curriculum Instructional Materials and Supplies (including but not limited to additional Tiered materials for students with IEPs)

We will also use software such as Brigance that will assist staff with transitions.

The BRIGANCE Transition Skills Inventory (TSI) helps educators easily assess independent living, employment, and additional post-secondary skills to support transition planning for middle- and high-school students. It assists with determining present level of performance in transition skills. It is used to develop transition goals and objectives for IEPs that meet IDEA requirements, assess a wide range of student abilities, monitors and reports progress toward transition goals, and deliver data-driven instruction with the BRIGANCE Transition Skills Activities.

The (TPI-3) provides school personnel with a systematic way to address critical transition planning areas that are mandated by the Individuals With Disabilities Education Act of 2004. It also accounts for individual student preferences, interests, strengths, and needs. Key information is gathered from students, parents, guardians, and school personnel through the use of core and specialized rating scales and open-ended questions. The TPI-3 can serve as the main vehicle for identifying transition needs or can complement existing procedures that are being used in a school district. In many cases, it can serve as a framework for acquiring more detailed assessment information. The most important outcomes are identifying transition preferences, interests, strengths, and needs, regardless of methodology; developing necessary plans; and acting on resultant goals.

Category 9 (Other) 
Provide the following information for Category 9 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)

ARP ESSER Funds will be used to purchase Cleaning Supplies to keep the schools sanitized and clean.  This will allow for a safe environment for students.

3200 - [400-499] Janitorial/Sanitizing Cleaning Materials & Supplies $100,000.00

 

Category 10 (Other) 
Provide the following information for Category 10 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)

ARP ESSER funds will be used to support current Nursing Staff to continue to promote Health and Wellness with our students.  This will be achieved by purchasing PPE Supplies, personal sanitation materials, equipment and supplies for schools and nursing stations due to increased need during the pandemic.  This support will last until September 30, 2024

Total Cost: $100,000.00 

2140 - [400-499] Materials and Supplies $100,000.00

 

 

Category 11 (Other) 
Provide the following information for Category 11 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)

-   Transportation Costs (Bus Mileage for Summer School and Extended Day) $20,000.00 (Will be used the Summer of 2023 & 2024)

4188 - [300 - 399] Bus Mileage for Extended Day and Summer School $20,000.00

 

Category 12 (Other) 
Provide the following information for Category 12 (Other):
1) Brief description and timeline for each service (service must end by 9/30/2024)
2) Number of employees and FTE(s) (if applicable)
3) Itemized Budget using Function & Object codes (must match Budget Grid)


Administrative Costs 
Program Administration must be reasonable and necessary in order to manage the federal grant in a compliant and effective manner.*
Provide a summary of how the grant program will be administered, including the title of the staff responsible for the grant administration, the FTE(s), and other funding sources (if applicable) that will contribute to administrative staff salaries/benefits. Additionally, the description must include all estimated costs, match the administrative costs dollar amount listed above, and include the Function and Object codes associated with the charge.
n/a


Indirect Costs 
Indirect Costs represent the expenses of doing business that are not readily identified with the ARP ESSER but are necessary for the general operation of the organization and the conduct of activities it performs. These costs must be reasonable and necessary, and LEAs can use the unrestricted indirect cost rate for calculation.*
% - Unrestricted Indirect Cost Rate for LEA
Maximum Indirect Cost amount for the ARP ESSER Fund
Function/Object Code used on the Budget Grid

SYSTEM PLAN ITEMS RELATED BY FISCAL RESOURCE
Expand All Collapse All

There are currently no Goal or Action Step items associated with this Grant.